Laserfiche WebLink
Chairman Eggert pointed out that the County obeys its own laws with very few <br />exceptions. <br />Commissioner Ginn stated that everyone knew the canal was there before they bought <br />in the neighborhood. She pointed out that they would be able to put plantings on both sides <br />of the wall. She felt staff had done an excellent job. <br />ON MOTION by Commissioner Ginn, SECONDED By <br />Commissioner Macht, the Board unanimously approved <br />Alternative No. 1 to construct a six foot high wall at an <br />estimated cost of $77,887.20, as recommended in the <br />Memorandum. <br />11.G.2. KINGS HIGHWAYIMPROVEMENTS PARTIAL RELEASE <br />OF RETAINAGE - KIMLEY-HORN <br />The Board reviewed a Memorandum of December 221997: <br />TO: <br />James E. Chandler, <br />% Retainage Requested <br />County Administrator <br />Survey <br />C� <br />THROUGH:, <br />James W. Davis, P.E., _ <br />Aerials <br />Public Works Director- <br />irectorFROM: <br />10% <br />$ 3,330.08 <br />FROM: <br />Terry B. Thompson, P. ., <br />10% <br />Capital Projects Manage <br />SUBJECT: <br />Kings Highway Improvements Partial Release of Retainage <br />DATE: <br />December 2, 1997 <br />DESCRIPTION AND CONDITIONS <br />The design of Phase I Kings Highway Improvements from, 1r Street to north of 26"' Street <br />is 100% complete. The consultant, Kimley-Horn and Associates, Inc. is requesting partial <br />release of retainage as follows: <br />Task <br />% Complete <br />% Retainage Requested <br />Amount <br />Survey <br />100% <br />10% <br />$ 9,595.30 <br />Aerials <br />100% <br />10% <br />$ 3,330.08 <br />Bridge Design <br />100% <br />10% <br />$32,125.50 <br />Roadway Design <br />88% <br />5% of Phase 1 <br />$16,863.60 <br />Landscape Design <br />95% <br />5% <br />$ 575.00 <br />Geotechnical <br />90% <br />5% <br />$ 2.435.00 <br />$64,924.48 <br />56 <br />December 9, 1997 <br />