My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/17/1998
CBCC
>
Meetings
>
1990's
>
1998
>
3/17/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:56 PM
Creation date
6/17/2015 10:43:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Eggert, the Board unanimously approved the <br />$9,210.25 right-of-way purchase and authorized the Chairman <br />to execute the Contract for Sale and Purchase with Elson R. <br />Smith, Jr. & Cecil Johnson, as Trustee of LeRoy E. Smith's <br />Sons, as recommended in the Memorandum. <br />COPY OF CONTRACT IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />11.H.1. 91H COURT WATERLINE LOOP CONNECTION -FINAL <br />PAYMENT _ FOR DESIGN. PERMITTING, & CONSTRUCTION - <br />DRIVEWAYS, INC <br />The Board reviewed a Memorandum of March 6, 1998: <br />DATE: MARCH 6, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R. HUBBS, P.E. <br />71 )1P <br />DIRECTOR OF UTILITY SERVI-t'ES <br />PREPARED MICHAEL C. HOTCHKISS, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: 9TH COURT WATER LINE LOOP CONNECTION <br />AUTHORIZATION FOR DESIGN, PERMITTING AND <br />CONSTRUCTION <br />INDIAN RIVER COUNTY PROJECT NO. UW -97 -08 -DS <br />WIP NO. 472-000-169-252.01 <br />LABOR CONTRACT NO. 4007 <br />BACKGROUND <br />On July 8, 1997, the Board of County Commissioners authorized <br />Driveways, Inc. to complete a loop connection for a water main <br />lateral located on 9th Court, between 2nd and 4th Streets (see <br />attached copy of meeting minutes). Construction of the project is <br />now complete. The Department of Utility Services is now requesting <br />approval for final payment to the contractor. <br />t. <br />March 17,1998 <br />59 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.