My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/17/1998
CBCC
>
Meetings
>
1990's
>
1998
>
3/17/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:56 PM
Creation date
6/17/2015 10:43:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROIIND <br />On December 2, 1997, the Board of County Commissioners approved pumps for the <br />Glendale School lift station through direct purchase from ABS Pumps. (See attached <br />agenda item and minutes, pages 40 and 41). During the installation process, the <br />operations staff found after further detail review that the existing wiring was <br />inadequate to handle the new pumps, along with the discovery of deficiencies within <br />the existing electrical system of the station. The deficiencies include, but are not <br />limited to, the necessity of the addition of a main fuse disconnect and upgrade of <br />antiquated power service to the station. The staff proposes to modify the wiring for <br />said lift station. <br />ANALYSIS <br />The staff has acquired three estimates to perform this job (including material). They <br />are listed as follows: <br />1. Mantz Electric, Inc., Vero Beach $4,425.00 <br />2. Paragon Electric of Vero, Inc. $4,017.00 <br />3. McCall Electric, Inc., Vero Beach $4,400.00 <br />The lowest quotation is from Paragon Electric of Vero Beach, Inc. in the amount of <br />$4,017.00. The fund for this project is from Account No. 472-000-169-231.00. <br />RE DATION <br />The staff of the Department of Utility Services recommends the Board of County <br />Commissioners approve the issuance of a purchase order to Paragon Electric of Vero <br />Beach, Inc. to install the upgrade of electrical wiring for the Glendale School Lift <br />Station in the amount of $4,017.00. <br />ON MOTION by Commissioner Eggert, SECONDED BY <br />Commissioner Ginn, the Board unanimously approved the <br />issuance of a purchase order to Paragon Electric of Vero Beach, <br />Inc. to install the upgrade of electrical wiring for the Glendale <br />School Lift Station in the amount of $4,017, as recommended in <br />the Memorandum. <br />B.A. SUNSHINE TRAVEL PARK <br />Chairman Tippin advised the Board that residents of Sunshine Travel Park have been <br />cited by the Code Enforcement Board because they have (without permits) added permanent <br />structures such as porches to their recreational vehicles. Because Sunshine Travel Park is <br />approved as a recreational vehicle park, permanent improvements are not allowed under our <br />regulations. The owners are requesting that our regulations be changed and that the Code <br />Enforcement Board be encouraged to extend their compliance date. <br />March 17,1998 <br />61 <br />E,0'eK � 6L P,,6E 700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.