My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/7/1998
CBCC
>
Meetings
>
1990's
>
1998
>
4/7/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:56 PM
Creation date
6/17/2015 10:51:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/07/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.7 <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval of the above - <br />listed project and requests authorization for the Department to proceed with the <br />design engineering work in preparation for the special assessment project. <br />ON MOTION by Commissioner Eggert, SECONDED BY <br />Commissioner Ginn, the Board unanimously approved the <br />project and authorized the department to proceed with the <br />design engineering work in preparation for the special <br />assessment project, as recommended and requested in the <br />Memorandum. <br />11.H.2. ADDITION OF SLUDGE THICKENER EQUIPMENT — <br />PILOT PROGRAM — HYCOR ROTARY DRUM THICKENER <br />EQUIPMENT — WHARTON—SMITH <br />The Board reviewed a Memorandum of March 23, 1998: <br />DATE: MARCH 23, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R. HUBBS, P.9. <br />DIRECTOR OF UTILITY SER <br />PREPARED ROBERT O. WISEMEN, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: ADDITION OF SLUDGE THICKENER EQUIPMENT - <br />PILOT PROGRAM <br />INDIAN RIVER COUNTY PROJECT NO. IIS -97 -22 -DC <br />WIP NO. 472-000-169-349.00 <br />BACKGROUND <br />On January 20, 1998, the Board of County Commissioners authorized a pilot program <br />to test the Hycor rotary drum thickener equipment prior to purchasing the unit. Due <br />to the thin nature of the waste activated sludge produced at the 'North County <br />Wastewater Treatment Plant, the staff of the Department of Utility Services requested <br />that Hycor provide the County with assurance that their equipment would work at <br />this plant. To respond to the County's concern, Hycor provided the County with a <br />four-week test period free of charge with the provision that upon satisfactory <br />April 7, 1998 - <br />51 <br />E,p0-K 10 p�cC <br />
The URL can be used to link to this page
Your browser does not support the video tag.