My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/14/1998
CBCC
>
Meetings
>
1990's
>
1998
>
4/14/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:56 PM
Creation date
6/17/2015 10:53:12 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />required Type "D" buffer is provided for by the conceptual plan by utilizing a dense area of <br />native upland vegetation. The properties to the north and south of the subject site are not <br />zoned multiple or single family but have a residential land use designation and are zoned <br />RMH-8 (Residential Mobile Home) and A-1 (Agricultural), respectively. It is staffs <br />position that the mobile home development to the north is comparable to multi -family type <br />zoning, and the large undeveloped property to the south that has a land use designation of <br />M-2 (up to 10 units/acre) is suitable for future multi -family development. At staffs <br />recommendation, the conceptual plan provides for a Type "D" buffer along the site's north <br />and south boundaries. The buffers depicted on the conceptual plan will be detailed with the <br />"final" site plans submitted for each phase. <br />15. Dedications and Improvements: No additional right-of-way is required from the site's <br />frontage along 9& Avenue or 12'" Street to satisfy the county's ultimate thoroughfare plan. <br />However, Public Works staff has identified a Murphy Act Right -of -Way Deed Reservation <br />on the subject site. Therefore, prior to the release of an approved site plan for the project, <br />the applicant must apply for and obtain from the county a Murphy Act Right -of -Way <br />Reservation release consistent with the approved conceptual plan, or amend the conceptual <br />plan to accommodate the Murphy Act reservation. <br />16. Specific Land Use Criteria: The application must satisfy all applicable criteria for a place <br />of worship. The place of worship specific land use criteria are as follows: <br />a. -- No building or structure shall be located closer than thirty (30) feet to any property <br />line abutting a residential use or residentially designated property; <br />Note: All existing and proposed building setbacks are greater than 751. <br />b. Access shall be from a major thoroughfare unless otherwise approved by the public <br />works department; <br />Note: The site will continue to access 90`s Avenue, a paved thoroughfare plan <br />roadway. <br />C. Any accessory residential use, day care facility or school upon the premises shall <br />provide such additional lot area as required for such use by this section -and shall <br />further be subject to all conditions set forth by the reviewing procedures and <br />standards for that particular use. Accessory residential uses may include covenants, <br />monasteries, rectories or parsonages as required by these regulations; <br />Note: No residential uses, day care facilities, or schools (other than Sunday <br />school classrooms) are proposed. <br />d. Type "C" screening shall be provided along all property boundaries where the facility <br />is located adjacent to a single-family residentially designated property. Type "D" <br />screening shall be provided along all property boundaries when the facility is located <br />adjacent to a multi -family residential designated property. <br />Note: The required Type "D" screening is provided along the site's east <br />boundary that abuts multi -family zoning. <br />Staff has verified that the site plan application satisfies all of the applicable specific land use <br />criteria." <br />Based on the analysis performed, staff recommends that the Board of County Commissioners grant <br />special exception use approval and conceptual plan approval for the proposed expansion to the <br />existing place of worship subject to the following conditions: <br />1. Prior to the issuance of a certificate of occupancy for the new sanctuary in Phase 2, <br />the site's existing 12'b Street entrance shall be closed. <br />2. Prior to the release of any approved site plan to implement the project, the applicant <br />shall apply for and obtain from the county a Murphy Act Deed Right -of -Way <br />Reservation release consistent with the approved conceptual plan, or amend the <br />conceptual pian accordingly. <br />APRIL 14, 1998 <br />-41- <br />C7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.