At this time, the WTS and West Regional Wastewater Treatment plant (WRWWTp) are <br />operating under extensions of their respective construction permits (DC31-237294 & <br />DC31-243685). Staff anticipates that the final operating permit for both the WTS and the <br />WRWWTP will be issued by FDEP this year. This issuance is contingent upon one year <br />of documenting the phosphorous removal data for the WTS. The documentation of data <br />will be complete in June of this year and will be a part of the annual operations report that <br />will be submitted to the FDEP. <br />At this time, staff has attempted to negotiate a revised contractual agreement with <br />Ecotech for overall operation and maintenance of the WTS (See attached contract). This <br />revised contract is to be performed over a one-year period (1998/99). Staff has been <br />unable to reach a contractual agreement with Ecotech for the revised agreement and <br />scope of services for operation of the WTS. (See attached documents, marked revised <br />contract) <br />Under this revised contract, Utility personnel will be responsible for the actual operation <br />and maintenance of the WTS with the guidance of the Contractor. During the term of this <br />contract, the Contractor will set up comprehensive sampling and training schedules as <br />outlined in the contract. The establishment of this comprehensive training schedule and <br />program will allow Indian River County employees to effectively operate the WTS. <br />Additionally, under the terms of the revised contract, the Contractor will no longer be <br />responsible for berm maintenance for the WTS. At the present time, Staff is reviewing <br />several different options (i.e., separate outside contract, internal agreement with Road and <br />Bridge or utilizing utility staff). A separate agenda item will be forthcoming explaining <br />these options and Staff s recommendation. The Contractor will assist in preparing an <br />annual report which will facilitate the issuance of the final operating permit for the WTS <br />and the WRWWTP. The annual report will summarize the results of the monitoring <br />program for the year. This report will include a detailed analysis of the data as outlined <br />in the engineering report. <br />Article 10 of the contract allows Additional Work upon receipt of authorization and <br />Notice to proceed from the Director of Utility Services. Compensation for additional <br />work shall be at a price negotiated between the Contractor and the County, not to exceed <br />$5,000.00. <br />Below are two options as related to this issue: <br />1. Approve the renewal of the existing contract with Ecotech Consultants, Inc. for <br />two additional years as stipulated for the following yearly amounts (See attached <br />documents): <br />1998/1999 $115,472.00 <br />1999/2000 $ 98,026.00 <br />2. Allow staff to re -advertise for bid the revised one-year contract for operation and <br />maintenance of the WTS. <br />The Staff of the Department of Utility Services recommends that the Board of County <br />Commissioners select and approve Option No. 2; Allow staff to re -advertise for bid the <br />revised one year contractfor operation and maintenance of the WTS. <br />April 28, 1998 <br />87 <br />