My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/5/1998
CBCC
>
Meetings
>
1990's
>
1998
>
5/5/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 10:58:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/05/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
co�K 10;.s r,'21 <br />FA6E <br />'The side yard setback will range from 0' to 8', with all buildings being separated by a minimum of 8', except along east <br />perimeter where RS 4 setbacks apply <br />2No building, pool, patio or deck can be located within the 30' Jungle Trail Buffer or within 25' of the west perimeter, <br />whichever distance is greater. <br />'Open space will be guaranteed through the setbacks on each individual lot and the overall controls on the conceptual PD plan. <br />General Note: Roof overhangs can encroach in privately dedicated easemems, no other structures shall be allowed to encroach <br />in easements of any type. <br />Genual Note: For lots with more than one front yard; a 6 fence can be placed in one of the front yards to provide privacy for <br />rear yard amenities. <br />General Note: Roof overhangs are allowed to encroach 3' onto the adjacent property. <br />General Note: The developer is requesting a 40' wide private right of way for the local road within the development. In <br />addition to the 40' wide right of way, there will be an 8' utility easement on both sides of the right of way to form a 56' wide <br />roadway and utility corridor. <br />It should be noted that, if the PD rezoning is approved, the approved conceptual plan will be <br />included as an actual exhibit to the ordinance that approves the rezoning request. Additional items <br />which are controlled by the conceptual plan include buffering and the overall subdivision layout. <br />REZONING ANALYSIS• <br />*Existing Zoning and Land Use Pattern <br />The subject site is presently an active citrus grove and is located on a principal arterial (CR 510) at <br />the northeast comer of the intersection with CR 510 and Jungle Trail. <br />To the north and west of the subject site are primarily residential areas within the Town of Orchid. <br />However, at the northwest comer of Jungle Trail and CR 510, immediately west of the southern <br />portion of the site, there is vacant commercially zoned property within the Town. Jungle Trail <br />physically separates the proposed project from the Town of Orchid, and provides an effective <br />physical barrier between the two developments. There is an area labeled as conservation area within <br />the Town of Orchid which separates the north portion of the proposed development from Jungle <br />Trail. Staff and the developer have been coordinating with the Town manager, who indicates that <br />the Town has no objections to the proposed project. <br />South of the subject site, across CR 510, is a grove zoned RM -6 with an L-2 land use designation. <br />East of the site is an existing residential area zoned RT -6 and RS -6 (please see attachment #2). <br />This area includes the Oceanaire Heights and Spring Place neighborhoods, both of which consist <br />primarily of single family homes. There are several duplexes in Oceanaire Heights. Since Oceanaire <br />Heights is zoned RT -6, duplexes are allowed in that subdivision. <br />It is the property to the east which will be most affected by the proposed rezoning, since that <br />property is the most heavily developed and is not physically separated from the subject property. <br />Generally, the proposed single family PD rezoning is consistent with the existing pattern of <br />development to the east In addition, a 10' wide Type "C" buffer is required along the east property <br />line, and all lots along the east property line are proposed to conform to the RS -6 minimum lot size, <br />dimensional, and setback criteria These factors should ensure that the proposed development is <br />compatible with the adjacent subdivisions. <br />*Future Land Use Map Pattern <br />The subject property has an L-2 land use designation, as does the property to the east and south. The <br />property to the north and west, within the Town of Orchid, has a residential land use designation <br />allowing up to 2 unitstacre, except for the commercially designated parcel at the northwest corner <br />of CR 510/Jungle Trail. The proposed PD rezoning of the subject property is consistent with the <br />county's Future Land Use Map. <br />Rezoning requests are reviewed for consistency with the policies of the comprehensive plan and <br />must also be consistent with the overall designation of land uses as depicted on the Future Land Use <br />Map. These include agricultural, residential, recreational, conservation, and commercial and <br />industrial land uses and their densities. Commercial and industrial land uses are located in nodes <br />throughout the unincorporated areas of bidian River County. <br />MAY 59 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.