Laserfiche WebLink
• <br />0 <br />Table NoA, cont Long Range Beach Erosion Control Budget Program - Estimated Plan Costs <br />Prepared by: Indian River County - Public Works Deapartment - Coastal Engineering Division <br />Description <br />Federal <br />state <br />Local <br />. Total <br />Federal <br />state <br />Local <br />TOW : <br />Federal <br />State <br />Local <br />Toter' <br />Eiemerde <br />Beach Profiles <br />- <br />25,000 <br />25,000 <br />db,000 <br />r, <br />Aerial Photography <br />15,000 <br />15,000 <br />3(1,000 <br />_ <br />Send Search investigation <br />' <br />Ecomordc Analysis - Beach Preservation District <br />Saotw 1- Feeder Beach ad R4 -R11 <br />� <br />Design (80cy/ft X 7,0001111.) - maximum vokune allowed <br />Permitting <br />1' <br />Counbuction <br />MonUo <br />37,500 <br />37,500 <br />76 .0.0 <br />25,000 <br />25,000 <br />A6,0� <br />25,000 <br />25,000 <br />60, <br />Sector 2 - Faader Eiaah Pio eot Rt 1•R11' ' 7'�' ' <br />Design (40cy/ft X 6.000ft.) <br />- <br />Permitting <br />construction <br />MonOofig <br />37,500 <br />37,500 <br />;; • : • ' .78,000 <br />25,000 <br />25,000 <br />.` ` Y' M.000 <br />25,000 <br />25,000 <br />lid Oti0 <br />Sedor 3, Beath Reeto o*m MAO s 0-M M <br />Design - 13ch.Res.(40ay/ft X 7,000111.) & Dune Matrd. (10cy/ft X 3,000ft.) <br />Penn" <br />construction - Restoration Project <br />1,344,000 <br />1,344,000 <br />2,080,000 <br />construction - Dune Metnt. <br />144,000 <br />144,000..;'1'280 <br />,000 <br />Monitoring50.000 <br />50,000 <br />100,1 <br />50.000 <br />58,000 <br />30.000 <br />30.000 <br />60,000 <br />Sector 4 - Nebritl Biaolr P o Ac6en <br />Bettor 6 - PEP d BeuOt Re�atlon set ti77-RBA <br />. . <br />Design (40cy/ft X 8,0001t.) <br />150,000 <br />150,000 <br />Permiftfig <br />37,500 <br />37,500 <br />76,000 <br />, <br />construction <br />1.728,000 <br />1,728,000 <br />��456,000 <br />Monitoring <br />50,000 <br />50,00000 <br />000 <br />50,000 <br />50.000 <br />100,000 <br />Sector tie Nsttitil Beach P (No Action Ro2!!d) <br />Seolar • Beach ReatoraOan PjNW 91 MR107 ' <br />'. <br />Design - Structure(s) & (10cy/ft X 7.000h.) <br />25,000 <br />25.000 <br />60.000 <br />100,000 <br />100,000 <br />.. <br />- <br />Permwng <br />25,000 <br />25,000 <br />:. ' 60,000 <br />Coraaruction <br />750,000 <br />750,000 <br />' 1,508,000 <br />Mo O <br />50,000 <br />50,000 <br />'. - •100,0!10 <br />Sector 8 - NaWrd Beach PAWNo Action ed) <br />rr r <br />r <br />TOTAL: <br />$ 1,825,500 1 <br />$ 1,825,500 1 <br />S 3,861,000 <br />1i <br />2,043,000 1 <br />$ 2,043,000 13 <br />40000 1 <br />$ 830,000 13 <br />830,000 1 <br />1A80,000 <br />Note. Costs Based on - 50% State, 50% Local Contribution <br />