•
<br />0
<br />Table NoA, cont Long Range Beach Erosion Control Budget Program - Estimated Plan Costs
<br />Prepared by: Indian River County - Public Works Deapartment - Coastal Engineering Division
<br />Description
<br />Federal
<br />state
<br />Local
<br />. Total
<br />Federal
<br />state
<br />Local
<br />TOW :
<br />Federal
<br />State
<br />Local
<br />Toter'
<br />Eiemerde
<br />Beach Profiles
<br />-
<br />25,000
<br />25,000
<br />db,000
<br />r,
<br />Aerial Photography
<br />15,000
<br />15,000
<br />3(1,000
<br />_
<br />Send Search investigation
<br />'
<br />Ecomordc Analysis - Beach Preservation District
<br />Saotw 1- Feeder Beach ad R4 -R11
<br />�
<br />Design (80cy/ft X 7,0001111.) - maximum vokune allowed
<br />Permitting
<br />1'
<br />Counbuction
<br />MonUo
<br />37,500
<br />37,500
<br />76 .0.0
<br />25,000
<br />25,000
<br />A6,0�
<br />25,000
<br />25,000
<br />60,
<br />Sector 2 - Faader Eiaah Pio eot Rt 1•R11' ' 7'�' '
<br />Design (40cy/ft X 6.000ft.)
<br />-
<br />Permitting
<br />construction
<br />MonOofig
<br />37,500
<br />37,500
<br />;; • : • ' .78,000
<br />25,000
<br />25,000
<br />.` ` Y' M.000
<br />25,000
<br />25,000
<br />lid Oti0
<br />Sedor 3, Beath Reeto o*m MAO s 0-M M
<br />Design - 13ch.Res.(40ay/ft X 7,000111.) & Dune Matrd. (10cy/ft X 3,000ft.)
<br />Penn"
<br />construction - Restoration Project
<br />1,344,000
<br />1,344,000
<br />2,080,000
<br />construction - Dune Metnt.
<br />144,000
<br />144,000..;'1'280
<br />,000
<br />Monitoring50.000
<br />50,000
<br />100,1
<br />50.000
<br />58,000
<br />30.000
<br />30.000
<br />60,000
<br />Sector 4 - Nebritl Biaolr P o Ac6en
<br />Bettor 6 - PEP d BeuOt Re�atlon set ti77-RBA
<br />. .
<br />Design (40cy/ft X 8,0001t.)
<br />150,000
<br />150,000
<br />Permiftfig
<br />37,500
<br />37,500
<br />76,000
<br />,
<br />construction
<br />1.728,000
<br />1,728,000
<br />��456,000
<br />Monitoring
<br />50,000
<br />50,00000
<br />000
<br />50,000
<br />50.000
<br />100,000
<br />Sector tie Nsttitil Beach P (No Action Ro2!!d)
<br />Seolar • Beach ReatoraOan PjNW 91 MR107 '
<br />'.
<br />Design - Structure(s) & (10cy/ft X 7.000h.)
<br />25,000
<br />25.000
<br />60.000
<br />100,000
<br />100,000
<br />..
<br />-
<br />Permwng
<br />25,000
<br />25,000
<br />:. ' 60,000
<br />Coraaruction
<br />750,000
<br />750,000
<br />' 1,508,000
<br />Mo O
<br />50,000
<br />50,000
<br />'. - •100,0!10
<br />Sector 8 - NaWrd Beach PAWNo Action ed)
<br />rr r
<br />r
<br />TOTAL:
<br />$ 1,825,500 1
<br />$ 1,825,500 1
<br />S 3,861,000
<br />1i
<br />2,043,000 1
<br />$ 2,043,000 13
<br />40000 1
<br />$ 830,000 13
<br />830,000 1
<br />1A80,000
<br />Note. Costs Based on - 50% State, 50% Local Contribution
<br />
|