My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/12/1998
CBCC
>
Meetings
>
1990's
>
1998
>
5/12/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 11:00:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/12/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b0 K F;i,`;� i)cy <br />of this project. <br />Utilities Department Director Don Hubbs advised that since the bids were opened on <br />April 15'. they tried to state in the agenda item some strategies which emerged from the <br />post -bid experience. Those strategies are included in the Memorandum above. The intent <br />is to make sure there is a competitive bid. In the pre-bid conference, there was a sense that <br />there would be some elements or factors in the proposed construction that would be pricey, <br />so it was not a big surprise that the bids came in high. He was confident it was a good design <br />and that the next set of bids would be more in keeping with the budgeted amount. Because <br />they were clustered closely, it meant that the construction documents.were clear and that the <br />contractors knew what they were bidding on. <br />Commissioner Adams inquired the cost of the rebid if it were done in-house, and <br />Director Hubbs responded that would be an engineer -of -record's function. He would not <br />recommend trying to do it in-house. <br />Commissioner Ginn liked the strategies that were developed and thought they should <br />result in cost savings. <br />The Chairman CALLED THE QUESTION and the motion <br />passed unanimously. <br />AMENDMENT NO.2 TO WORK AUTHORIZATION <br />IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />11.H.3. WASTEWATER PLANT - NORTH COUNTY <br />INTERCONNECTION - ENGINEER'S FINAL PAY REQUEST <br />The Board reviewed a Memorandum of May 1, 1998: <br />DATE: <br />May 1, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R. HUBBS, P. . <br />DIRECTOR OF UTILITY R <br />DEPARTMENT OF UTILITY SERVICES <br />PREPARED AND WILLIAM F., P.E. <br />STAFFED BY: CAPITAL S ENGINEER <br />May 12, 1998 <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.