Laserfiche WebLink
_I <br />Existing Uses on 44.11 acres <br />Outlet retail 333,089 SF <br />Proposed Uses on 138.73 acres <br />Outlet retail <br />200,000 SF <br />General retail <br />120,000 SF <br />Resort hotel <br />200 rooms <br />Economy hotel <br />80 rooms <br />Cinema <br />12 screens <br />Golf course <br />9 holes <br />Recreation/amusement <br />3 acres <br />Total acreage: <br />182.84 acres <br />The DRI application proposes new commercial development along S.R. 60, east and west <br />of 90 Drive (the existing S.R. 60 access road for the project). Also, new commercial <br />development is proposed south of the existing outlet stores. Between the existing lake and <br />the southern boundary of the site, a golf course and environmentally sensitive area preserves <br />(wetlands and uplands) are proposed. <br />1. Comprehensive Plan/Rezoning Issue: The DRI proposal is dependent on a comprehensive <br />plan amendment to "swap -out" commercially designated land for residentially designated <br />land and vice versa in the southern portion of the site. The proposed redesignations would <br />result in no net increase in commercially designated acreage. The amendment has already <br />been considered by the Planning and Zoning Commission and the Board of County <br />Commissioners, and has been transmitted to the State. The comprehensive plan request is <br />scheduled to be heard by the Board at its June 2, 1998 meeting, just prior to the hearing on <br />this DRI request. <br />2. Environmental Impacts: The total 182.84 acre site consists of various types of uplands and <br />wetlands, and developed land. The proposal addresses uplands and wetlands impacts <br />through design and preservation measures. In terms of design, environmentally sensitive <br />wetland and upland area along I-95 and the southern 1/3 of the site will be retained and <br />enhanced. Also, existing hardwood wetlands (characterized by stands of maples) located on <br />both sides of 940 Drive at S.R. 60 will be retained. In terms of preservation, the developer <br />already contributed to the county's upland set-aside fund for the initial (existing) outlet <br />center development, and proposes preservation areas as follows: 15.66 acres of scrubby <br />flatwoods, 7.67 acres of pine flatwoods, 2.94 acres of sand pine scrub, and 36.24 acres of <br />mixed wetland hardwoods. <br />3. Transportation Impacts: Outlet center expansion is proposed to be completed by the end <br />of 2002. Thus, the traffic impact analysis performed by the developer and accepted by the <br />TCRPC, FDOT, and county traffic engineering staff analyzed estimated traffic impacts for <br />a 2002 project completion date. Given the type of retail proposed and the project's proximity <br />to the I-95/S.R. 60 interchange, it is estimated that a high percentage of traffic will be from <br />I-95. In accordance with the findings of the accepted traffic impact analysis, signalization <br />of the S.R. 60/1-95 on and off ramps will be required. This requirement is reflected in the <br />recommended D.O. Signalization of the project's SR 60/94th Drive entrance is anticipated <br />and is addressed in the recommended D.O. The traffic analysis indicates that acceptable <br />levels of service will be maintained for roadways and intersections impacted by the project <br />with the conditions contained in the recommended D.O. <br />A second access point to S.R. 60 is proposed west of the outlet center's existing 94th Drive <br />access. Secondary accesslemergency access will use the new S.R. 60 connection and will <br />provide driveway "by-passes" west and south of the existing outlet center (see attachment <br />#6). This secondary access system will interconnect with the existing and proposed <br />development. It should be noted that. due to the existence of the New Hibiscus Airport west <br />of the project, there is no opportunity at this time for access from the outlet center to 98th <br />avenue. <br />During its December 1996 review of the golf course conceptual plan, the Board of County <br />Commissioners heard from owners of residentially designated property located south of the <br />proposed golf course area which comprises the southern 1/3 of the project Property owners <br />asked that Horizon be required to grant access from S.R. 60 through its site to their <br />properties. At the Board hearing, staff pointed out that providing access through the golf <br />course area would negatively impact environmentally sensitive preserve areas and would <br />provide only a lengthy, circuitous access through commercial development for future <br />residents. In its approval of the special exception request, the Board agreed with staff that <br />the DRI "...shall address potential S.R. 60 access to properties south of the overall DRI <br />project area. However, no such access shall be required through the golf course -area..'. <br />JUNE 2,1998 <br />• -43- <br />• <br />