Laserfiche WebLink
Boa 106 PnE 48 <br />•Development Approval Options Available to the Developer <br />Presently, the site is zoned General Commercial (CG), a zoning district which allows mini storage <br />facilities as an administrative permit use and limits such facilities to a maximum size of 3 acres. <br />Any rezoning action must comply with the site's C/I, CommerciaUIndustrial land use designation. <br />There are two options available to the developer to seek approval of the proposed project. Either of <br />the two options, if approved, would allow the applicant to proceed with his project, as proposed. <br />These options are as follows: <br />1. Rezone the site to the CH, IL, or IG zoning district, all of which allow mini storage facilities <br />as permitted uses, with no restrictions on the facility acreage; OR <br />2. Rezone the site to a PD zoning district that is tied to a conceptual PD plan proposing a 4.76 <br />acre mini storage facility. <br />On staff s recommendation, the developer has opted for a PD rezoning. If approved, the PD <br />rezoning would effectively rezone the property in accordance with the approved conceptual PD plan. <br />•The PD Zoning District, Generally <br />Although many PD projects have been reviewed in the county, few of those projects have involved <br />PD rezonings. Unlike standard zoning districts, there are no specific size or dimension criteria for <br />PD districts. Instead, the PD district is based on the underlying land use plan designation for density <br />and use limitations, and on compatibility requirements. In the PD zoning district, setbacks and other <br />typical zoning district regulations are established on a site by site basis through approval of a <br />conceptual PD plan. Adopted as part of the PD zoning for a property, the conceptual plan serves as <br />the zoning standard for the site. <br />A rezoning to the PD district requires the submission of a binding conceptual PD plan which, along <br />with certain PD district requirements, limits uses and sets -forth specific development standards on <br />the site. Thus, a PD rezoning allows a unique PD district to be developed specifically for each <br />development site. <br />In this case, the conceptual and preliminary PD plan proposes an 87,287 square foot mini storage <br />facility on 4.76 acres. Aspects of the proposed conceptual/preliminary PD plan will be addressed <br />in the "Plan Analysis" section of this report. <br />•The PD Rezoning Process <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1. Rezoning and Conceptual PD Plan Approval: Review and recommendation made by <br />staff and by the Planning and Zoning Commission. Final action taken by the Board <br />of County Commissioners. <br />STEP 2. Preliminary PD Plan/Plat (combination of site plan and preliminary plat) Approval: <br />Review and recommendation made by staff. Final action taken by the Planning and <br />Zoning Commission, subject to the Board's action on the rezoning request. <br />STEP 3. Land Development Permit or Permit Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (road, utilities, drainage). <br />STEP 4. Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />June 9, 1998 <br />.M <br />