Laserfiche WebLink
• <br />• <br />STEP 5. Final PD Plat Approval: Review and recommendation made by staff. Final action <br />taken by the Board of County Commissioners. <br />STEP 6. Certificate of Occupancy: Reviewed and issued by staff for use and occupancy of <br />buildings. <br />The applicant is pursuing approval of Steps 1 and 2 at this time. <br />Once a PD conceptual plan is approved, only minor modifications to the conceptual plan can be <br />_approved at a staff level. Any proposed changes that would intensify the site use (e.g. increase the <br />maximum building area) or reduce compatibility elements (e.g. reduced buffering) may be approved <br />only via a process involving public hearings held by both the Planning and Zoning Commission and <br />the Board of County Commissioners. <br />*Proposed PD District for the Project Site <br />The subject site has a C/I (Commercialdndustrial) land use designation. The underlying land use <br />designation allows a variety of commercial and industrial districts. Since the land use controls the <br />use of the property by limiting the applicable zoning districts, any rezoning must be compatible with <br />the uses allowed by the property's land use designation. Once a specific PD rezoning is approved <br />for a site, the applicable PD conceptual plan adopted as part of the rezoning limits the type of <br />specific uses and intensity of development on the site and establishes the site's dimensional criteria. <br />Although PD zoning district parameters are flexible, certain standards related to uses, compatibility <br />(buffering), infrastructure improvements, dimensional criteria, and open space are set forth in <br />Chapter 915 (P.D. Process and Standards for Development Ordinance) of the county's land <br />development regulations (LDRs). Based upon the proposed conceptual PD plan and the Chapter 915 <br />standards, the proposed PD district for the subject site contains the special elements identified in the <br />table below. That table also lists corresponding CG district criteria for comparison purposes. <br />Element <br />Proposed PD District <br />CG Zoning District <br />Uses Allowed <br />Same as CG, except mini <br />Variety of commercial, retail, <br />storage facilities (even those <br />eating & drinking, and office <br />over 3 acres) are permitted <br />uses; some institutional uses. <br />uses. <br />Mini storage facilities up to 3 <br />acres in size. <br />Maximum Building Coverage <br />42.1% <br />40% <br />Minimum Green Area <br />30% <br />25% <br />Perimeter Setbacks <br />North: 90' <br />North: 75' <br />South: 200' <br />South: 20' <br />East: I F <br />East: 10' <br />West: I P <br />West: 10' <br />Note: As a trade-off for increasing the maximum building coverage from 40% to 42.1%, the <br />proposed district would increase the minimum open space requirement from 25% to 30% and would <br />significantly increase the site's required rear yard setback. The site's rear yard abuts a mobile home <br />park. <br />June 9, 1998 <br />41 <br />BOOK IQb PAGE �� <br />