My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/28/1998
CBCC
>
Meetings
>
1990's
>
1998
>
7/28/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:10:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/28/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 28, 1998 <br />Building Exterior: <br />• The building was constructed in 1978, and looks like a 70's era <br />shopping mall. It is dated. A total rehab of the exterior wall will be <br />required for conversion to offices. <br />• Exterior walls are 6'/cinch thick precast concrete panels, <br />approximately 21 feet wide, and in excellent condition. They are <br />finished primarily with exposed aggregate, painted. Interspersed <br />in some panels are faces of smooth or ribbed -texture concrete, <br />also painted. There are no windows or openings in the walls <br />except for doorways and one glazed opening at the former <br />Penney's store. A substantial number of windows or glazed door- <br />ways will have to be cut in order to convert to offices. <br />• The precast concrete panels at the former Penney's and <br />Upton's stores have been stuccoed and divided into smaller <br />panels with galvanized control joints. The stucco appears in gener- <br />ally good condition at both stores, but hairline cracks show some <br />failure and streaking on the Penney's walls. <br />• The building apparently had at some time rainwater leaders <br />from roof overflow scuppers to under -sidewalk trench drains. <br />These no longer exist. <br />• The roof is a sloped built-up asphaltic membrane roof with <br />exposed aggregate. Judging from the number of visible leaks on <br />interior ceiling tiles, the number of roof patches at areas where <br />water stands and around equipment, and the areas of exposed <br />asphalt or bleed -through, the entire roof membrane and roof <br />insulation, should be replaced. <br />There is a good slope from a central ridge to both east and west, <br />but roof drains are inadequate and poorly placed at the low sides <br />of the roof. Some overflow drains exist, but recent flashing repairs <br />on the west side have covered some overflow scuppers. Despite <br />the positive slope, several areas on the roof show where ponding <br />occurs, frequently in the same areas where repairs have been <br />made (modified bitumen sheets). <br />• Plexiglass dome skylights over the central mall area appear in <br />very good condition with no evidence of leaking. <br />Building interior: <br />• The building is really a group of three contiguous buildings <br />comprising approximately 170,000 sq. ft., of which 150,000 was <br />previously leasable. The two stores at the north and south ends of <br />the complex are approx. 40,000 and 47,000 sq. ft. Converted to <br />offices, the project would become a Group B (Business) Occu- <br />pancy rather than Group M (Mercantile) under the Standard Build- <br />ing Code. Exit travel distance limits to existing exterior doors <br />would not change, however, since code allows 250 ft. in fully <br />sprinklered buildings for both occupancies. <br />• Interior structural elements such as steel columns and bar joists <br />are not now fireproofed, and depending on new space usage <br />would probably not require fireproofing. <br />• All interior materials and finishes including ceilings, flooring, <br />walls and water fountain require complete demolition and removal. <br />Some exterior walls may be insulated, but extent is unknown, and <br />is likely inadequate to meet current energy savings criteria. It is <br />impractical to assume that anything more than the building shell <br />and structure are salvageable for reuse. <br />• Costs will be incurred for adding acoustical attenuation materi- <br />als to negate the noise from passing trains 4 or 5 times a day will <br />be required. <br />• Current ceilings are 2 x4 -ft. lay -in acoustical tile, suspended at <br />approx. 15-17 ft. in the mall, and at about 13 ft. in the anchor <br />stores. Throughout the facility, ceilings are in mediocre -to -poor <br />condition, with many stained, broken, and sagging tiles. Even <br />34 <br />Rnox 106 fnE 0 <br />it 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.