My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/11/1998
CBCC
>
Meetings
>
1990's
>
1998
>
8/11/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:11:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 10 WE' U <br />ON MOTION by Commissioner Ginn, SECONDED BY <br />Commissioner Adams, the Board unanimously (4-0, <br />Commissioner Eggert absent) approved the utilization of county <br />utility maintenance crews to construct the proposed force main <br />at an estimated labor cost of $9,247 and authorized the purchase <br />of materials from U.S. Filter/Davis at an estimated material cost <br />of $12,392.40, as presented in the memorandum, for a total <br />estimated project cost of $21,639.40, as recommended in the <br />Memorandum. <br />11.H.4, CR510 FORCE MAIN - EMERGENCY REPAIRS - <br />MASTELLER AND MOLER, INC. <br />Utilities Department Director Don Hubbs reviewed a Memorandum of August 10, <br />1998 and a letter of August 10, 1998: <br />DATE: August 10, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />r -- <br />RECEIVED <br />FROM: DONALD R. HUBBS, P.E.. ` l�� ►� AUG 10 1998 <br />DIRECTOR OF UTILITY SEi�V ds! <br />CLERK TO THE BOARD <br />J <br />PREPARED AND WILLIAM F. MCCAIN, P.E..' /- <br />STAFFED BY: CAPITAL PROJECTS gER <br />SUBJECT: COUNTY ROAD 510 FORCE MAIN, EMERGENCY REPAIRS <br />BACKGROUND <br />On August 4, 1998, County staff discovered a failed support bracket on the west side of the <br />second bridge going over the Indian River. No breach of the force main integrity occurred. Staff <br />monitored the force main around the clock to ensure that no contamination of the lagoon would <br />occur. On August 4 and 5h several meetings were held with the design firm of record and the <br />construction firm to determine the appropriate course of action. On August 5', repairs were <br />completed to the force main with no loss of system integrity. Staff is awaiting final direction for <br />a more permanent fix, to what appears to be an ongoing problem. The project Engineer. <br />- - Masteller and Moler, Inc, is currently evaluating the issue. <br />Staff has written a letter to the Engineer summarizing discussions and actions to date (Please see <br />copy of letter attached). All costs to date will be paid by Indian River County for repairs. <br />August 11, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.