My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/11/1998
CBCC
>
Meetings
>
1990's
>
1998
>
8/11/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:11:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />DATE: JULY 31, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRA <br />FROM: DONALD R. HUBBS, P.) \ <br />DIRECTOR OF UTILITY -S -F <br />PREPARED AND ROBERT O. WISEMEN, P.E. �m <br />STAFFED BY: ENVIRONMENTAL ENGINEER <br />GENE A. RAUTH & z <br />OPERATIONS MANAGER <br />SUBJECT: SCHUMANN DRIVE FORCE MAIN <br />CONSTRUCTION INITIATION <br />INDIAN RIVER COUNTY PROJECT NO. US -96 -25 -CS <br />BACKGROUND <br />On February 11, 1997, the Board of County Commissioners authorized staff to design, permit <br />and ready for construction the above -referenced project. The BCC approved the utilization of the <br />current labor contract with Driveways, Inc., to construct the project with the additional costs <br />involved being brought back to the Board for approval. (See attached copy of agenda item) <br />ANALYSIS <br />The Utilities Department has looked carefully at the project and proposes that County utility <br />maintenance/construction crews install the force main. The attached estimated cost for in-house <br />labor for installation is $9,247.00. All materials will be purchased directly from the County <br />material supplier, U.S. Filter/Davis, at an estimated cost of $12,392.40. Staff has obtained a <br />quote from the labor contractor of $14,629.78 for the labor only. In an effort to minimize costs <br />and complete the project as efficiently as possible, the Department of Utility Services <br />recommends utilizing in-house staff and purchasing all materials from U.S. Filter/Davis for a <br />total estimated cost of $21,639.40, resulting in a cost savings of $5,382.78. <br />KWO1013"MI-W• <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve the utilization of County utility maintenance crews to construct the <br />proposed force main at an estimated labor cost of $9,247.00 and authorize the purchase of <br />materials from U.S. Filter/Davis at an estimated material cost of $12,392.40, as presented above <br />for a total estimated project cost of $21,639.40. <br />ROW/aa <br />Attachments <br />August 11, 1998 <br />59 <br />BOOK 106FgF �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.