My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/25/1998
CBCC
>
Meetings
>
1990's
>
1998
>
8/25/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:13:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/25/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />0 <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Eggert, the Board unanimously approved Change <br />Order No. 3 to the contract with Camp Dresser & McKee, in the <br />amount of $58,193.471 resulting in a new contract amount of <br />$5,713,619.53, as recommended in the Memorandum. <br />CHANGE ORDER ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />MHA CENTRAL REGION WASTEWATER TREATMENT <br />FACILITY CONSTRUCTION OF NON -SPEC EFFLUENT LINE - <br />DRIVEWAYS. INC. AND U.S. FILTER/DAVIS - FINAL PAYMENT <br />AND CHANGE ORDER <br />The Board reviewed a Memorandum of August 6, 198: <br />DATE: AUGUST 6, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: D011ALD R. HUBBS, P.E. <br />DIRECTOR OF UTILITY SERC S <br />PREPARED ROBERT O. WISEMEN, P.E. (1 �1 <br />AND STAFFED ENVIRONMENTAL ENGINES <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: CENTRAL REGION WASTEWATER TREATMENT FACILITY <br />CONSTRUCTION OF NON -SPEC EFFLUENT LINE <br />LABOR CONTRACT NO. 4007. AUTHORIZATION NO. 51 <br />FINAL PAYMENT AND CHANGE ORDER NO. 1 <br />INDIAN RIVER COUNTY PROJECT NO. US -95 -23 -DC <br />WIP NO. 475-000-169-244.00 <br />BACKGROUND <br />On April 21, 1998, the Board of County Commissioners approved the <br />utilization of the Labor Contract in the amount of $9,310.70 to construct a <br />non -spec effluent line to the Bent Pine Ponds Cell No. 1. The material was <br />purchased directly from U.S. Filter/Davis, a County supplier (Bid No. 6010), in <br />the amount of $35,939.47. <br />ANALYSIS <br />Due to a misunderstanding of the construction plans, the labor contractor <br />overlooked some items in the construction drawing, which resulted in a <br />shortage in his preliminary estimate. The oversight was in the area where <br />there was an interconnection of pipe with the existing force main, which is <br />reflected in the amount of fittings and restrainers for adjustment. The actual <br />location of the existing pipe was also different than was shown on the as -built <br />August 25, 1998 <br />53 <br />Boor. 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.