My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/25/1998
CBCC
>
Meetings
>
1990's
>
1998
>
8/25/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:13:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/25/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK JOG PAGE64 <br />drawing. The pipe was located under overgrown Brazilian Peppers along the <br />edge of the ditch requiring some additional clearing during construction. The <br />existing pipe is also deeper than expected resulting in additional cubic yards of <br />material and exploratory excavation time. (See attached spreadsheet.) Lastly, <br />the seed and mulch for rights-of-way stabilization was not estimated in the <br />preliminary cost. The originally suspected location of the pipe was in an area <br />where seed and mulch was not required, since ground cover would grow back <br />naturally. However, the actual pipe location was in an area where erosion <br />could easily take place so seed and mulch was placed to prevent erosion. The <br />total additional labor cost is $4,076.00 and adjusts the total contract amount <br />to $13,386.70. <br />The preliminary estimated cost for material was inadequate. The adjustment in <br />material costs is $6,667.37. As stated earlier, the existing pipe was found four <br />to five feet deeper than suspected, requiring adjustment for valve accessibility. <br />Two options for correction were considered: <br />a. Build a seven foot high, 10 -foot by 10 -foot concrete vault at an estimated <br />cost of over $10,000.00, including material and labor, or <br />b. Extend the stems of the valves at a cost of $1,945.00, including installation. <br />The adjustment of valve stems is the more economical approach. <br />In summary, <br />Labor Material <br />Original amount $ 9,310.70 $ 35,939.47 <br />Additional/ adjustment 4,076.00 8,612.37 + <br />New Contract Amount $13,386.70 $ 44,551.84 <br />Amount paid to date 7,096.23 35,939.47 <br />Balance to date $ 6,290.47 $ 8,612.37 <br />This figure includes the material adjustment cost in the amount of <br />$6,667.37 and valve adjustment material and installation in the amount of <br />$1,945.00. <br />The labor contract portion is complete. The material portion is not complete. <br />The County will compensate the material supplier upon completion of the <br />installation of the valve stems. This will be done by the material vendor in the <br />amount of $1,945.00, which is included in the $8,612.37 cost. <br />RECOMMENDATION <br />The Department of Utility Services recommends the Board of County <br />Commissioners approve the following: <br />1. An adjustment in the labor contract in the amount of $4,076.00 to <br />Driveways, Inc., which adjusts the final contract amount to $13,386.70. <br />2. Final payment to labor contractor, Driveways, Inc., in the amount of <br />$6,290.47 for services rendered to complete existing authorization. <br />3. Adjustment in the material cost to U.S. Filter/Davis in the amount of <br />$8,612.37, including adjustment cost of valve stems with installation in the <br />amount of $1,945.00. <br />4. Final payment to U.S. Filter/Davis of a balance of $8,612.37 upon <br />completion of the valve stem adjustment. <br />August 25, 1998 <br />54 <br />0 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.