Laserfiche WebLink
The Board reviewed a Memorandum of August 24, 1998: <br />DATE: AUGUST 24, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADNNISTRATOR <br />FROM: DONALD R. HUBBS, P.E. <br />DIRECTOR OF UTILTIY' E <br />PREPARED JAMES D. C1% <br />AND STAFFED MANAGER OF�E_ PROJECTS <br />BY: DEPARTMENT OF UTII.IIY SERVICES <br />SUBJECT: SEBASTIAN WATER EXPANSION - PHASE 11-B <br />RESOLUTION III - PURUC HEARING <br />DMIAN RIVER COUNTY PROJECT NO. UW -97 -11 -DS <br />BACKGROUND <br />On August 11, 1998, the Indian River County Board of County Commissioners <br />approved Resolutions 98-77 (Resolution I) and 98-78 (Resolution II), which contained <br />the preliminary assessment roll and established the date of the public hearing for the <br />subject project. Property owners have been notified of the public hearing by certified <br />mail. Resolution 98-77 was published in the PRESS JOURNAL on August 17, 1998. <br />(See attached agenda item and minutes for the above meeting.) <br />ANALYSIS <br />Design of the water distribution system is complete. Approval of the attached <br />Resolution III will confirm and approve the preliminary assessment. <br />An informational meeting was held for the property owners on August 25, 1998 at 7:00 <br />p.m. in the County Commission Chambers. The attached map displays the area to <br />benefit from the assessment project. The area to be served is located north of CR 512 <br />and east of Roseland Road. <br />This area includes all or portions of 41 blocks. Included are 758 lots. There are 714 <br />Parcel IDs. Typical lot sizes are .25 acre, plus or minus. <br />The City of Sebastian entered into an interlocal agreement with Indian River County <br />providing for the transfer of the City of Sebastian's water and wastewater system on <br />September 20, 1995. The agreement requires the County to extend water or wastewater <br />transmission, distribution or collection facilities and improvements, and impose special <br />assessments upon benefited parcels located within the incorporated area of the City. <br />At their regular meeting of June 26, 1996, the City Council adopted Resolution No. R- <br />96-48 (copy attached), which waived the sixty-day notice requirement as per Section <br />6.07(B) of the interlocal agreement. This resolution further states that the City Council <br />deems it in the best interest of the citizens of Sebastian that Indian River County <br />proceed as soon as possible with the water expansion. <br />The attached map displays the area to benefit from the assessment project. This project <br />is to be paid through the assessment of property owners along the proposed <br />line <br />route. In the interim, financing will be from the assessment fund with inter -fund <br />borrowing from the water impact fee fund (472) and operations and maintenance fund <br />(47 1). Engineering design services and the assessment roll have been prepared by staff. <br />Survey work was provided by Masteller, Moler and Reed, Inc. We are now ready to <br />begin the assessment process associated with this project. The total estimated cost and <br />amount to be assessed is $1,714,277.33. The total estimated cost per square foot is <br />$0.208299 (rounded). <br />The estimated cost of Phase II -B is greater than Phase II -A ($0.191713), primarily due to <br />the cost to overlay paving of 21 intersections, where there will be necessary road cuts. <br />This is a requirement of the City of Sebastian for roads that are classified to be in good <br />condition. As with Phase II -A and all of Phase II, costs are estimated greater due to a <br />higher ratio of improvements, concrete driveways, more stringent restoration <br />specifications, and conservancy with the estimate, as well as a smaller area of property <br />to distribute the cost over. The assessed cost, as with any project, will be regulated by <br />the degree of competition at the bidding of the project. <br />On August 17, 1998, a letter was sent to the City Manager, Thomas Frame, City of <br />Sebastian with a copy of this agenda item, a map of the Phase. II -B (Phase II) project <br />area, and a summary assessment roll schedule. <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve the attached Resolution M. <br />SEPTEMBER 1, 1998 <br />-48- <br />