My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/15/1998
CBCC
>
Meetings
>
1990's
>
1998
>
9/15/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:58 PM
Creation date
6/17/2015 11:16:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/15/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Future Land The Policy 5 encourages the use of the Planned Development (PD) overlay district <br />to provide design flexibility. The PD overlay zoning distrWt provides the ability to develop the <br />entire long, narrow parcel as a mini storage use without some of the potential undesirable uses along <br />SR 60 that a rezoning to CH, IL, or IG could pose. <br />Compatibility with Surrounding Area <br />Staff's position is that granting the request to rezone the property to PD will result in development <br />which will be compatible with surrounding areas. Since the land to the east and west are zoned _ <br />General Commercial (CG), and since the buildings closest to SR 60 are designed to look like general <br />office uses, the request is generally consistent with the existing zoning pattern. As indicated on the <br />conceptual plan, the most intense use of the site will occur near SR 60 with the retail office, <br />residence, and majority of the parking; the storage buildings will be located close to the side lot <br />lines, with the building wall and accompanying required foundation plantings foaming a buffer for <br />the adjacent commercial property. The development will enhance compatibility with property to the <br />south via a set back for all hard improvements a minimum of 200' from the south property line, <br />which is the property line nearest to a residential area <br />Concurrency Impacts <br />No concurrency related services or facilities will be affected, since the rezoning is essentially a <br />"lateral" rezoning. <br />Environmental Impacts <br />These issues will be addressed in the plan analysis. <br />PD PLAN ANAT-VgVR: <br />The conceptual/prelimmary PD plan depicts a small retail space, a small office, a manager's <br />residence, two mini storage buildings, and supporting infrastructure. <br />1. Size of Site: 4.99 acres <br />2. Zoning Classifications: Current: CG, General Commercial <br />Proposed: PD, Planned Development <br />3. Land Use Designation: C/I, Commercial/Industrial <br />4. Building Area: Office: 975 sq. & <br />Residence: 784 sq. & <br />Retail: 2,871 sq. & <br />Siomgc- 82,110 c_n ft <br />Total: 86,740 sq. & <br />Note: Two storage buildings are proposed, and will include externally accessed units with <br />roll -up doors as well as some units accessed from within an enclosed building. <br />5. Building Coverage: Allowed in CG: 40.0% <br />Proposed in PD: 39.5% <br />6. Impervious Area: Proposed. 140,804 sq. & <br />7. Open Space: Required in CG: 25% <br />Proposed in PD: 30% <br />Note: The minimum open space required through the PD rezoning process will be 30%. <br />8. Parking: Required: 24 spaces <br />Provided: 24 spaces <br />Note: Parldng is provided based upon new county parking standards for mini storage uses. <br />9. Setbacks: Front (north): Required by PD: 90' <br />Provided: 100' <br />Rear (south): Required by PD: 200' <br />Provided: 210' <br />Sides (east & west): Required by PD: 11' <br />Provided: 11' <br />Note: These setback requirements are proposed to be established for the subject site through <br />the proposed PD district rezoning. <br />September 15, 1998 <br />-21- BOOK 107 PAGE ^4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.