Laserfiche WebLink
BOOK 107 FACE iib <br />10. Traffic Circulation: The project will have a single full movement driveway to SR 60. that <br />will align with the existing median opening for the post office. The driveway will provide <br />access to parking areas and mini storage units for loading and unloading. The driving aisle <br />along the front of the proposed office and residence will be stubbed out to the east and west <br />property lines to provide for future interconnections with adjacent commercial uses. The <br />internal circulation plan, which includes a 34' two-way driving aisle to serve most of the <br />storage units, has been reviewed and approved by the traffic engineering division. Based <br />on the low trip rate, no off site traffic improvements are required, and none are proposed. <br />11. Stormwater Management: The project's stormwater management plan has been approved <br />by the public works department, and the developer will be required to obtain a Type "A" <br />permit prior to site plan release. There is a single storrawater pond proposed at the south end <br />of the site which provides additional setbacks and buffering for the residential uses to the <br />south. Since the pond is over 2' deep, the stormwater management ordinance requires that <br />the pond be fenced or otherwise secured by a barrier. The applicant has proposed use of a <br />vinyl clad chain link fence, in accordance with the SR 60 corridor plan. <br />12. Utilities: The project will be connected to county water and sewer. This meets both <br />concurrency requirements and utility connection matrix requirements. These utility <br />provisions have been approved by the county's Department of Utility Services and the State <br />Health Department. <br />13. Landscape Plan and Buffers: The landscape plan generally complies with Chapter 926 and <br />the SR 60 corridor plan. This plan depicts a Type "B" buffer with a 6' opaque feature along <br />the south property line adjacent to the mobile home park. Approval was granted by the <br />Planning and Zoning Committee for the applicant to use vegetation rather than a masonry <br />wall to satisfy the 6' opaque feature requirement. In order to achieve this buffer, the <br />applicant proposes to use over 5 times the understory trees required (3 required, 17 provided) <br />and 2%i times the required number of shrubs (23 required, 69 provided). <br />14. Environmental Issues: The 4.99 acre site is not subject to the native upland set-aside <br />requirement, since it is under 5 acres. <br />15. Dedications and Improvements: None are required. <br />16. SR 60 Corridor Plan Criteria: Since the site is located within the SR 60 corridor plan area, <br />the corridor plan criteria apply. The plan meets the SR 60 corridor plan criteria as described <br />below: <br />a. SR 60 Roadway Landscaping: The project site fronts SR 60 only; there are no other <br />roadways bordering the site. Based upon 175' of SR 60 frontage and a 30' wide <br />access that takes up 30' of the frontage, staff has verified that the project has 145' of <br />SR 60 plantable frontage. The applicant is proposing a 25' deep planting strip along <br />SR 60. All elements of the landscape plan meet the SR 60 corridor plan criteria. <br />b. .Architectural: The two main buildings that will be visible from SR 60 will be the <br />retail building and the office manager's residence. Both buildings will have a <br />standing seam hip roof with a 6:12 pitch. The mini storage building will have a low <br />slope roof concealed by a parapet with cornice molding features. Like the MAGI <br />site, the overhead doors of the 2 main mini storage buildings will face inward, <br />towards the internal driving aisle, and will not be visible from off site. <br />C. Foundation Plantings: All proposed buildings have foundation plantings. <br />Foundation plantings for the mini storage buildings will be placed on the project <br />perimeter (along the rear of the buildings), while the office and manager's residence <br />will have foundation plantings in front of the buildings. The foundation plantings <br />meet the SR 60 corridor plan criteria. <br />17. Preliminary PD Plat: The applicant has submitted a preliminary PD plat, which essentially <br />plats over the site plan improvements and creates two lots and a stormwater tract. The lots <br />will essentially separate the retail (north portion of the site) and mini storage components <br />(south portion). The proposed PD plat meets all applicable regulations. <br />18- Signs: The freestanding sign for this project will be a landscaped monument style sign. A <br />complete sign package is required to be submitted with the building permit submittal. Staff <br />will review the sign package for compliance with the SR 60 corridor plan. <br />19. Lighting Plan: The lighting plan submitted by the applicant generally consists of black pole <br />lights with "shoe box" fixtures. The lighting plan is consistent with the SR 60 corridor plan. <br />20. Concurrency: The applicant has satisfied the concurrency requirements for preliminary PD <br />plan approval. <br />September 15, 1998 <br />0 <br />-22- <br />