Laserfiche WebLink
N <br />to <br />G <br />F5, <br />JOINT FIBER OPTIC BACKBONE EXPANSION PROJECT <br />TIME <br />TOTAL <br />CVB <br />IRCO <br />IRSB <br />L- <br />FRAME <br />COST <br />PHASEI <br />The City of Vero Beach had already placed fiber optic cables between substations, the <br />C O <br />M P <br />L E <br />T E <br />D <br />County had shady placed fiber optic cable for communications to the old Courthouse <br />and then fiber between the Sheriff's office and the new courthouse via the County Administration <br />$908,300 <br />$35,000 <br />$689,500 <br />$183,800 <br />Building for communications and for video arraignment, and the School District had place <br />fiber between Vero Beach Elementary, Vero Beach High School, and the Freshmen Learning <br />Center and also between Sebastian River High School and Sebastian River Middle School, <br />before the three entities partnered in an expansion of fiber based facilities in conjunction <br />with the 800 MHz radio system that resulted In a jointly owned fiber optic backbone. In 1998, fiber <br />_Wjc cable was placed between the Main Llbrary and the Courthouse for connectivity to the Law Library <br />PHASE II <br />Phase II will consist of placing fiber optic cables from the ShadfPs Office east to USi, South <br />19981199 <br />$726,161 <br />$205,914 <br />$159,393 <br />$360,852 <br />to the Administrative offices of Indian River County and the School Board via 26th Street. <br />After looping In the administrative offices, the fiber will be extended south along the railroad <br />tracks to 20th Street, west past the BellSouth Vero Beach Central Office and south on 17th <br />Avenue to the Vero Beach High School. Fiber will be extended west along 16th Street to 27th <br />Avenue and South on 27th Avenue to 12th Street to Interface with the fiber feed from FP&L. <br />Fiber will be extended from VBHS to Old DWe Hwy and south on Old DWe to the South Tower. <br />Two elementary schools win be connected to the firer backbone and fiber will be extended from <br />the North Tower to Sebastian River High School along CR 512 post the North County Lib <br />PHASE III <br />Phase III will provide a western Loop from the Piper Substation to 58th Avenue, south to the South <br />1999/200 <br />$684,593 <br />254,482 <br />104,125 <br />$325,985 <br />Relief Canal & East to Old Dime Highway. A loop will be extended west from the Sheriff's Office <br />to 58th Avenue and South on 58th Avenue to the new 58th Avenue SuBstation and the Mueller Center. <br />Fiber wig be extended east from the railroad tracks along 20th Street to Indian River Boulevard and <br />south to the Power Plant. There will be an Oslo extension to connect County facilities, J. A. <br />Thompson Elementary School, and an IRCO water plant. An extension in the Highlands <br />will connect Highlands Elementary and an IRCO waste water treatment plant. Glendale and <br />Rosewood schools will be connected to Vero Beach High School. <br />PHASE IV <br />In Phase IV, the 27th Avenue run will be extended south to Citrus Elementary and the Ixora facility. <br />2000/2001 <br />$516,173 <br />$108,162 <br />$138,044 <br />$269,967 <br />A loop on Indian River Boulevard will connect the City's power plant, Indian River Memorial <br />Hospital, Substation 6, a tubae EMS station, and medical centers. Fiber wig be placed to the <br />barrier Mand from the Power Plant and north on AIA to Indian River Shores. <br />Fiber will be extended tram SRHS to a new Elementary School on 510. <br />PHASE V <br />Indian River County has several facilities that could be targeted for fiber connectivity, but at <br />FUTURE <br />$467,747 <br />$487,747 <br />this time, neither the School DlsMct or the City of Vero Beach have identified a need to <br />ITOTALS <br />participate In these routes. These are optional extensions that may never be undertaken, but <br />they were Identified, priced, and the rest of the backbone was sized to accommodate them if <br />Phe expansion Is undertaken. Man 2-5 <br />$2,394,6741 <br />$568,558, <br />$869,311 <br />$956,804 <br />• <br />0 <br />