<br />JOINT FIBER OPTIC BACKBONE EXPANSION PROJECT
<br />TIME
<br />TOTAL
<br />CVB
<br />IRCO
<br />IRSB
<br />L-
<br />FRAME
<br />COST
<br />PHASEI
<br />The City of Vero Beach had already placed fiber optic cables between substations, the
<br />C O
<br />M P
<br />L E
<br />T E
<br />D
<br />County had shady placed fiber optic cable for communications to the old Courthouse
<br />and then fiber between the Sheriff's office and the new courthouse via the County Administration
<br />$908,300
<br />$35,000
<br />$689,500
<br />$183,800
<br />Building for communications and for video arraignment, and the School District had place
<br />fiber between Vero Beach Elementary, Vero Beach High School, and the Freshmen Learning
<br />Center and also between Sebastian River High School and Sebastian River Middle School,
<br />before the three entities partnered in an expansion of fiber based facilities in conjunction
<br />with the 800 MHz radio system that resulted In a jointly owned fiber optic backbone. In 1998, fiber
<br />_Wjc cable was placed between the Main Llbrary and the Courthouse for connectivity to the Law Library
<br />PHASE II
<br />Phase II will consist of placing fiber optic cables from the ShadfPs Office east to USi, South
<br />19981199
<br />$726,161
<br />$205,914
<br />$159,393
<br />$360,852
<br />to the Administrative offices of Indian River County and the School Board via 26th Street.
<br />After looping In the administrative offices, the fiber will be extended south along the railroad
<br />tracks to 20th Street, west past the BellSouth Vero Beach Central Office and south on 17th
<br />Avenue to the Vero Beach High School. Fiber will be extended west along 16th Street to 27th
<br />Avenue and South on 27th Avenue to 12th Street to Interface with the fiber feed from FP&L.
<br />Fiber will be extended from VBHS to Old DWe Hwy and south on Old DWe to the South Tower.
<br />Two elementary schools win be connected to the firer backbone and fiber will be extended from
<br />the North Tower to Sebastian River High School along CR 512 post the North County Lib
<br />PHASE III
<br />Phase III will provide a western Loop from the Piper Substation to 58th Avenue, south to the South
<br />1999/200
<br />$684,593
<br />254,482
<br />104,125
<br />$325,985
<br />Relief Canal & East to Old Dime Highway. A loop will be extended west from the Sheriff's Office
<br />to 58th Avenue and South on 58th Avenue to the new 58th Avenue SuBstation and the Mueller Center.
<br />Fiber wig be extended east from the railroad tracks along 20th Street to Indian River Boulevard and
<br />south to the Power Plant. There will be an Oslo extension to connect County facilities, J. A.
<br />Thompson Elementary School, and an IRCO water plant. An extension in the Highlands
<br />will connect Highlands Elementary and an IRCO waste water treatment plant. Glendale and
<br />Rosewood schools will be connected to Vero Beach High School.
<br />PHASE IV
<br />In Phase IV, the 27th Avenue run will be extended south to Citrus Elementary and the Ixora facility.
<br />2000/2001
<br />$516,173
<br />$108,162
<br />$138,044
<br />$269,967
<br />A loop on Indian River Boulevard will connect the City's power plant, Indian River Memorial
<br />Hospital, Substation 6, a tubae EMS station, and medical centers. Fiber wig be placed to the
<br />barrier Mand from the Power Plant and north on AIA to Indian River Shores.
<br />Fiber will be extended tram SRHS to a new Elementary School on 510.
<br />PHASE V
<br />Indian River County has several facilities that could be targeted for fiber connectivity, but at
<br />FUTURE
<br />$467,747
<br />$487,747
<br />this time, neither the School DlsMct or the City of Vero Beach have identified a need to
<br />ITOTALS
<br />participate In these routes. These are optional extensions that may never be undertaken, but
<br />they were Identified, priced, and the rest of the backbone was sized to accommodate them if
<br />Phe expansion Is undertaken. Man 2-5
<br />$2,394,6741
<br />$568,558,
<br />$869,311
<br />$956,804
<br />•
<br />0