My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/1998
CBCC
>
Meetings
>
1990's
>
1998
>
11/10/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:26:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrator Chandler advised that this item was for information only; the full <br />program will be presented in the spring of 1999. He added that any input the Board may <br />have will be included at that time. <br />Commissioner Eggert commented that when the North and Main Library's budgets <br />were done, a proper amount had not been included for the required equipment. She had <br />spoken to Budget Director Joseph A. Baird and understood that he had included those dollars <br />in the West Library's budget figures. <br />Director Baird confirmed that additional money had been added to the West Library's <br />budget for the equipment. His office is studying the North and South Library's budget <br />figures to determine whether funding had already been included. If necessary, the <br />appropriate amounts will be added before the next time the Board reviews the planned <br />appropriations. <br />Commissioner Eggert also stated that the North Library was in desperate need of <br />expansion and asked if there was any possibility that funding for architectural plans could <br />be moved up to FY 1999-2000 (from FY 2000-2001) so the expansion could actually be <br />built the following year. <br />Director Baird advised that the dollars could be moved, and Administrator Chandler <br />added that these figures had been plugged in and were subject to change under the direction <br />of the Board. <br />Commissioner Eggert was pleased to see that Emergency Services Director Doug <br />Wright had gotten the Emergency Services "guestimates" and locations into the preliminary <br />figures. She hoped the Board would continue funding efforts on the Library system. <br />11.G.1. RESOLUTION NO. 98-125 - AS -BUILT RESOLUTION AND <br />ASSESSMENT ROLL FOR PAVING & DRAINAGE IMPROVEMENTS <br />TO 101ST AVENUE FROM 79TH STREET TO 87TH STREET IN <br />VERO LAKE ESTATES SUBDIVISION - PROJECT 9309 <br />The Board reviewed a Memorandum of October 27, 1998: <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Directo <br />FROM: Michelle A Gentile, CET <br />Civil Engineer <br />November 10, 1998 <br />65 <br />600K iN PAGE 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.