My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/8/1998
CBCC
>
Meetings
>
1990's
>
1998
>
12/8/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:29:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/08/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK �y0.1 `� <br />I r11� <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Macht, the Board unanimously waived the fee. <br />11.G. CONSULTANT SELECTION (NEGOTIATE WITH ZEP <br />CONSTRUCTION. INC.) - CIVIL ENGINEER/CONSTRUCTION <br />CONTRACTOR - DESIGN/BUILD FOR CR512 ROADWAY BRIDGES <br />OVER FELLSMERE FARMS WATER CONTROL DISTRICT PARK <br />LATERAL CANAL AND LATERAL "U" CANAL EAST OF SUN AG <br />The Board reviewed a Memorandum of December 2, 1998: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E. <br />Public Works Directo;� r <br />SUBJECT: Consultant Selection - Civil Engineer/ Construction Contractor <br />- Design/Build for CR512 Roadway Bridges over Fellsmere Farms <br />Water Control District Park Lateral Canal and Lateral "U" <br />Canal East of Sun Ag <br />DATE: December 2, 1998 <br />DESCRIPTION AND CONDITIONS <br />The consultant selection committee, consisting of Terry Thompson <br />Capital Projects Engineer, Terry Cook Road and Bridge <br />Superintendent, and Jim Davis, Public Works Director, interviewed <br />three engineering firms on November 30, 1998, for the purpose of <br />consultant ranking for the CR512 Fellsmere Roadway Bridges over <br />Fellsmere Farms Water Control District Park Lateral Canal and <br />Lateral "U" Canal. <br />After considering the selection criteria published in the R.F.P., <br />the committee recommends the following prioritized short-list: <br />1) Zep Construction Inc. - Ft. Myers, FL. <br />2) Murphy Construction, Co. - West Palm Beach, FL. <br />3) B.K. Marine Construction, Inc. - Vero Beach, F1. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends approval of the above prioritized short-list and <br />authorization to proceed with contract negotiation with the first <br />ranked firm, Zep Construction, Inc. <br />December 8, 1998 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.