Laserfiche WebLink
€BOOK 107 PACE <br />ON MOTION by Commissioner Ginn, SECONDED <br />by Commissioner Stanbridge, the Board <br />unanimously approved the renewal of the Class `B" <br />Certificate of Public Convenience and Necessity for <br />the Indian River Memorial Hospital Medical <br />Transport Service to be effective for a period of 2 <br />years, as recommended by staff. <br />11.G.1. FRONTAGE ROAD AT NORTHEAST CORNER OF <br />INDIAN RIVER BOULEVARD AND ROYAL PALM BOULEVARD - <br />CHANGE ORDER #2 - RANGER CONSTRUCTION - PROJECT <br />8530C <br />The Board reviewed a Memorandum of December 7, 1998: <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />Terry B. Thompson, P.E <br />Capital Projects Manag <br />FROM: G. Sean McGuire, P.E. L <br />��- <br />Project Engineer <br />SUBJECT: Change Order #2 - Frontage Road at NE Corner of <br />Indian River Boulevard and Royal Palm Boulevard <br />Project No. 8530C <br />DATE: December 7, 1998 <br />Ranger Construction Industries, Inc. has completed the specified improvements under this <br />contract Several items of work have required more or less quantities than that provided <br />for on the bid form. These quantities are proposed to be adjusted by the unit prices <br />provided on the bid form. Some work has been removed from the project by requests from <br />Public Works staff. The existing subgrade soil was found to be suitable without all of the <br />work required as Type "B" Stabilization, so a portion of the price for that work is offered as <br />a credit. The existing traffic interconnect cable was left undisturbed due to the reduction <br />of the Type °B" Stabilization, so the bid price for that work is also offered as a credit. A <br />complete reinstallation of all of the traffic loops was determined to be necessary, but a <br />lower price was received from a tern bid contractor, so all of the remaining traffic loop <br />items were deleted from the contract and a credit is offered for them. The term bid <br />contractor was engaged and has completed this work. <br />New work was added for modification to the existing stormwater drainage system in order <br />to accommodate future plans by the City of Vero Beach for the development of their Royal <br />palm Pointe project. City staff have approved the additional price presented and will <br />reimburse Indian River County for this cost. <br />DECEMBER 15, 1998 <br />• <br />-64- <br />C <br />