My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/26/1999
CBCC
>
Meetings
>
1990's
>
1999
>
1/26/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:55 PM
Creation date
6/17/2015 12:17:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />BOOK 108 PAGE , <br />The attached maintenance map is a result of a location survey to determine the boundary. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends the Chairman approve the maintenance map for 25' Avenue from the South line <br />of Spruce Park Subdivision to 42" d Street so that it can be filed with the Clerk of Court for Indian <br />River County. The only funds expended at this time will be for filing of the map. <br />ATTACHMENTS <br />Maintenance Map l� °A -P ,.� <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Ginn, the Board unanimously approved the <br />maintenance map,for 25' Avenue from the south line of Spruce <br />Park Subdivision to 42' Street which shall be filed with the <br />Indian River County Clerk of Court, as recommended in the <br />Memorandum. <br />11.G.3. OSLO ROAD AT 27TH AVENUE INTERSECTION <br />IMPROVEMENTS AND 5 -LANE WIDENING OF OSLO ROAD - <br />DICKERSON FLORIDA, INC. - CHANGE ORDER NO. 1 <br />The Board reviewed a Memorandum of January 15, 1999: <br />TO: James Chandler, County Administrat <br />THROUGH: James W. Davis, P.E., Public Works <br />AND <br />Christopher J. Kafer, Jr., P.E., Count <br />FROM: Michelle A. Gentile, CET, Civil Engi <br />SUBJECT: Change Order No. 1 to Intersection Improvements to Oslo Road & 27' <br />Avenue and Five Lane Widening of Oslo Road - IRC Project No. 9723 <br />DATE: January 15, 1999 <br />DESCRIPTION AND CONDITIONS <br />Construction of the above referenced project is underway. The proposed drainage pipe to connect <br />the drainage from the Oslo Plaza within the Oslo Road right-of-way was not included as part of the <br />original contract. The site developer for Oslo Plaza indicated that the county was responsible for this <br />pipework which would be considered part of the offsite improvements. The cost for the additional <br />pipe and the cost for the removal of an existing drainage structure will be reflected in the attached <br />Change Order No. 1. <br />JANUARY 26, 1999 <br />28 <br />0 Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.