Laserfiche WebLink
BOOK 108 PAGE474 <br />The conceptual PD plan depicts an 18 hole private (membership only) golf course with clubhouse, <br />and maintenance facility. <br />1. Size of Site: 316.02 acres <br />2. Zoning Classifications: <br />Curr-ent: CH, Heavy Commercial <br />RM -6, Residential Multi -Family <br />RS -6, Residential Single -Family <br />A-1, Agricultural <br />Proposed: PD, Planned Development Commercial and Residential <br />Land Use Designations: C/I Commercial/Industrial <br />M-1 Medium Density (up to 8 units/acre) <br />L-2 Low Density 2 (up to 6 units/acre) <br />4. Proposed Building Area: <br />Clubhouse: 10,000 sq. & <br />Maintenance Building 10.000 sq. ft. <br />Total: 20,000 sq. & <br />5. Proposed Building Coverage: Proposed building area is less than 1% of the site area <br />Note: For the purpose of this PD zoning district, a maximum building coverage of 2% is <br />allowed. For comparison purposes, it should be noted that maximum building coverages <br />allowed in the site's existing districts are as follows: CH is 40%; RS -6 and RM -6 are 30%; <br />and A-1 is 20%. <br />6. Open Space: <br />Required: 30.00% <br />Provided: 97.58% <br />Note: For the purpose of this PD zoning district, a minimum of 900/c open -space is required. <br />7. Parking: <br />Required: 102 spaces <br />Provided: 132 spaces <br />Note: There will be 110 paved spaces with the remainder being grassed. Grassed spaces are <br />allowed for up to 25% of the golf course use, and for overflow parking. <br />8. Setbacks: The club house will be within a 4.5 acre designated area approximately 350' east <br />of 581 Avenue in the northwest portion (see attachment #3) of the site. Setbacks from the <br />perimeter of the project will be consistent with zoning regulations and the approved PD <br />conceptual plan. The maintenance building will be located in a designated 3 acre portion of <br />the site approximately 600' north of 77' Street and 120' from the west perimeter of the site. <br />9. Traffic Circulation: The project will have a full access driveway on 581 Avenue (Kings <br />Highway), which will be the main access point for the facility. This driveway will provide <br />access to the clubhouse. A separate full access driveway on 7r Street will provide access <br />to the maintenance facility. The internal circulation plan and two access points have been <br />approved by the County Traffic Engineering Department. <br />A traffic impact statement has been reviewed and approved by the County Traffic <br />Engineering Department. The approved traffic impact statement indicates that no off-site <br />improvements are required. Also, the County Traffic Engineering Department has <br />conceptually approved the internal circulation plan. <br />10. Stormwater Management: The conceptual stormwater management plan has been reviewed <br />and approved by the Public Works Department. A detailed stormwater plan will need to be <br />filed with the final site plan, and the applicant will need to obtain a Type "B" stormwater <br />management permit prior to site plan release. - - <br />11. Utilities: The project will be connected to county water and sewer. This meets both <br />concurrency requirements and utility connection matrix requirements. These utility <br />provisions have been approved by the county's Department of Utility Services and the State <br />Health Department. <br />MARCH 2, 1999 <br />