Laserfiche WebLink
12. Landscape Plan and Buffers: The conceptual landscape plan complies with the landscape and <br />buffering requirements of Chapters 926 and 971. Detailed landscape plans will be reviewed <br />and approved by the Planning and Zoning Commission during the preliminary PD plan <br />review/approval process. <br />13. Specific Land Use Criteria: The PD zoning district will incorporate the specific land use <br />criteria for golf courses, which are as follows: <br />a. Golf courses and accessory facilities shall not be interpreted to include stand-alone <br />commercial miniature golf courses and/or driving ranges or other unenclosed <br />commercial amusements, open to the general public. <br />Note: The golf course will have no stand alone uses. <br />b. No major accessory use or principal building or structure shall be located closer than <br />one hundred (100) feet to any lot line which abuts a residentially designated property; <br />however, the one hundred (100) foot setback may be reduced to normal zoning <br />district setbacks if the use of the abutting residentially designated property is non- <br />residential (e.g. institutional, recreation, community services uses) and if a type "B" <br />buffer with six (6) foot opaque feature is provided between the building and <br />structures and the abutting residentially designated property. <br />Note: All principal buildings will beset back 100' or more. <br />C. Golf courses shall, to the most reasonable extent, retain and preserve native <br />vegetation over at least thirty (30) percent of the total upland area of the course due <br />to their characteristically high water demand and heavy nutrient loads; <br />Note: Approximately 25 acres of native uplands will be preserved. <br />d. The golf courses and practice fairway, if lighted, shall be designed so that any <br />lighting is shielded and directed away from residential areas; <br />Note: Any lighting proposed will be directed away from adjacent right-of-ways and <br />properties. <br />e. Type "B" screening shall be provided between golf maintenance facilities and <br />adjacent residentially designated property within two hundred (200) feet of the golf <br />maintenance facility. <br />Note: The proposed locations for both the clubhouse and golf maintenance facility are <br />greater than 200' from any residentially designated property. Therefore, a Type "B" <br />buffer is not required. <br />14. Environmental Issues: <br />Upland Set-aside: Since the project is over 5 acres, the native upland setaside criteria <br />in LDR section 929.05 apply. While the central section of the site has been <br />significantly disturbed by past sand mining and off-road vehicles, the east and west <br />portions of the development are relatively undisturbed native upland habitats. The <br />developer shall coordinate with the county environmental planning staff on satisfying <br />the upland preservation criteria with a conservation easement. As proposed, the <br />conceptual PD accommodates a conservation area which exceeds the county's <br />requirements, although the final location of the actual easement has not yet been <br />determined. The location of the easement will need to be finalized, and the easement <br />dedicated, prior to the issuance of a land clearing and tree removal permit for the <br />project. <br />Endangered Species: The subject site may contain habitat for endangered or <br />Potentially endangered species of flora and fauna. These concerns will need to be <br />addressed by the developer by providing county staff with letters from the U.S. Fish <br />and Wildlife Service and the Florida Game and Freshwater Fish Commission stating <br />that the agencies have no objection to the issuance of a land clearing and tree <br />removal permit for this project. Agency letters will need to be submitted to county <br />staff prior to issuance of land clearing permits, and prior to issuance of a land <br />development permit or waiver <br />Wetlands: There are approximately 33.2 acres of wetlands on-site. The majority of <br />the wetlands are located along the east and west boundaries of the site. The applicant <br />will need to obtain a county wetland resource permit as well as a permit from the St. <br />Johns Water Management District (SJWMD) for any impacts to the wetlands. The <br />applicant will need to obtain a county wetlands resource permit and a St. Johns River <br />Water Management District permit prior to PD plan release. <br />MARCH 29 1999 <br />-21- BOOK 108 PACE 475 <br />L <br />