My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/2/1999
CBCC
>
Meetings
>
1990's
>
1999
>
3/2/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:23:45 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/02/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMMATIONS AND FUNDING <br />Staff recommends approval of the attached Amendment No.l, <br />increasing the contract cost with Applied Technology and Management <br />by $21,950 -from $117,888 to $139,838. Funding to be from account <br />#128-144-572-033.19. <br />ON MOTION by Commissioner Adams, <br />SECONDED by Commissioner Stanbridge, the <br />Board unanimously approved Amendment No. 1 to <br />the Agreement with Applied Technology and <br />Management, for anew contract cost of $139,838, as <br />recommended by staff. <br />AMENDMENT IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />11.G.3. OSLO ROAD AND 27TH AVENUE - INTERSECTION <br />IMPROVEMENTS AND 5 -LANE WIDENING -CHANGE ORDER #2 <br />- DICKERSON FLORIDA <br />The Board reviewed a Memorandum of February 16, 1999: <br />TO: James Chandler, County Administrator <br />l' <br />THROUGH: James W. Davis, P.E., Public Works Directot� <br />AND <br />Christopher J. Kafer, Jr., P.E., County Engin <br />FROM: Michelle A. Gentile, CET, Civil Engineer wk <br />SUBJECT: Change Order No. 2 for Intersection Improvements to Oslo Road & 27' <br />Avenue and 5 Lane Widening of Oslo Road - IRC Project No. 9723 <br />DATE: February 16, 1999 <br />DESCRIPTION AND CONDITIONS <br />Construction of the above mentioned road is underway. A portion of Oslo Road was closed between <br />27' Avenue and 33' Avenue allowing contractors to install reinforced concrete pipe in the Sub - <br />Lateral Canal. <br />The select bedding material used to backfill over this pipe did not meet the FDOT's gradation <br />requirements, but exhibited a high permeability rate. Therefore Dickerson Florida, Inc. has agreed <br />to reduce the unit price for this material by $3.00 a cubic yard. This will change the unit price from <br />$15.90 per cubic yard to $12.90 per cubic yard. The amount to be credited to the contract will be <br />$16,650.00. <br />There are a couple of structures that need to be lowered to prevent stormwater overflow from the <br />Oslo Road Project onto the undeveloped land. The total cost for this adjustment will be $726.00. <br />MARCH 2, 1999 <br />L- <br />-41- <br />BOOK 108 PAGE 495 <br />
The URL can be used to link to this page
Your browser does not support the video tag.