My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/9/1999
CBCC
>
Meetings
>
1990's
>
1999
>
3/9/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:55 PM
Creation date
6/17/2015 12:24:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/09/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br />BOOK D8 PAGE555 <br />service area (USA) and allows 1 unit per acre for areas outside the urban service area in <br />calculating the total number of units allowed. <br />7. Surrounding Land Uses: North: SR 60, Vacant, ResidentiaURM-8, RM -6, <br />RS -6 _ <br />South: Agricultural/A-1 <br />East: Office, Single -Family <br />Agricultural/RM-6, PRO, RS -1, A-1 <br />West: Agricultural, Life for Youth Ranch/A-1 <br />8. Open Space and Recreation: Open space and PD recreation area requirements will <br />be exceeded through the provision of parks, golf course, perimeter buffers, lakes, and <br />private open space. <br />Recreation Area: Required: <br />14.39 acres (2.4%) <br />Provided: <br />35.06 acres (5.8%) <br />Open Space: Required: <br />391.54 acres (64.9%) <br />Provided: <br />426.57 acres (70.7%) <br />Note: Open space requirements are based on PD open space standards applied to <br />land designated M-1 and AG -1, on a pro -rated basis. <br />9. Landscaping and Buffering: <br />A minimum 25' planned development setback is required and provided around the <br />entire perimeter of the development. Planted buffers, greater setbacks, and other <br />compatible measures are required and proposed for certain perimeter areas within the <br />development. These are as follows: <br />MARCH 9, 1999 <br />0 <br />SR 60 Entrance Area Commercial/Office- <br />Requires 30' setback along the east and west sides, with a SR 60 corridor plan <br />landscape strip along SR 60 and a Type "B" buffer with 6' opaque feature <br />along the east and west sides, as specifically recommended by the Planning <br />and Zoning Commission. The SR 60 building setback is 75'. <br />Multi -Family Area: <br />Along a short segment of a north property line, multi -family development <br />inside the project is proposed adjacent to single-family located outside the <br />project Along that interface, a 25' setback and either a Type "C" buffer with <br />a 3' opaque feature or a Type "D" buffer with a 6' opaque feature is required. <br />Blementary School Site: <br />The elementary school site will have a 200' building setback from the east <br />property line (West Lake Estates) and a 50' building setback from the south <br />property line (16v' Street). Along the school site/West Lake Estates interface, <br />a 30' wide Type "C" buffer must be constructed prior to completion of Phase <br />IA, as specifically recommended by the Planning and Zoning Commission. <br />Prior to opening of the school, a 6' high vinyl clad chain link fence with <br />opaque vegetative screening or a 6' masonry wall must be constructed along <br />the interface. <br />Residential Outside Urban Service Area: <br />Agricultural areas outside the urban service area (USA) and adjacent to the <br />project perimeter will be buffered by the golf course. The golf course will <br />34 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.