Laserfiche WebLink
BOOK 108 PAGE557 <br />Driving Range/Multi-Family Buffers: <br />The applicant is proposing a golf course driving range that will abut a <br />proposed multi -family block to the west. Although this interface is interior <br />to the project, a Type "D" buffer or equivalent with no opaque feature is <br />required to separate these particular uses. The buffer must be constructed <br />with development of the driving range, which is in Phase I. <br />10. Parking: <br />The developer has committed to meeting the number of spaces required by the <br />county's parking regulation for all uses proposed. Under those regulations, the <br />developer may, at a future date, prepare a shared parking study for the Town Center <br />area to justify lower rates. Such rates would require Planning and Zoning <br />Commission approval. Any such shared parking study would need to comply with <br />section 954.08(2). Staff anticipates there will be shared parking among Town Center <br />uses and will encourage use of the parking study option during review of preliminary <br />PD plans. <br />11. Traffic Circulation: <br />The project will access SR 60, 16m Street, 7411 Avenue and 12"' Street. There will be <br />one access point on SR 60, one access point on 121' Street, two access points on 741' <br />Avenue, and multiple access points on 161h Street. Internal circulation will be <br />provided by a main boulevard and a series of internal streets laid out on a modified <br />grid system. Transit stops are proposed at prominent and highly accessible locations, <br />and will be integrated into an overall project design theme. The design of the transit <br />stops will be finalized in Phase IA. <br />It should be noted that the dedication and improvements section of this report <br />provides a list of traffic improvements to be provided over time as the project is built <br />and as vehicle trips are generated/attracted by the development. These improvements <br />have been determined based upon a traffic analysis submitted by the applicant and <br />approved by traffic engineering. That analysis indicates that the road improvements <br />covered in the dedication and improvements section will need to be constructed. In <br />addition, various other traffic areas will need to be monitored during the course of <br />overall project development. The traffic impact analysis indicates that a developer's <br />agreement should include: <br />a) A monitoring condition for potential signalization at the main project <br />entrance on SR 60. <br />b) A monitoring condition for the geometric improvements, as well as <br />signalization, at SR 60 and I-95 east and west ramp intersections. <br />c) A monitoring condition regarding the golf cart crossing on 70 Avenue. The <br />county stipulates that, if the 74th Avenue traffic volume reaches 2,500 <br />vehicles daily or 250 vehicles in the peak hour or if a safety problem is <br />discovered, then a grade separation crossing must be constructed. <br />Responsibilities and timing of required improvements and conditions will be covered <br />in further detail in a developer's agreement that is being negotiated with Public <br />MARCH 9, 1999 <br />36 <br />