Laserfiche WebLink
I <br />BOOK 103 PAGE 573 <br />g. All streets, lanes, and pedestrian systems, shall be privately owned and <br />maintained but shall be open to the public with no gates. However, gates <br />may be allowed within the equestrian area on pedestrian/animal paths where <br />it is necessary to contain animals. <br />h. The streetscape shall be consistent on both sides of any street, even between <br />different use types, and <br />i. A minimum of 20% of the total number of single homes must be built at the <br />minimum 7.5' frontyard setback as measured to the home or porch, and <br />j. No more than 20% of the total number of single-family homes can be set <br />back more than 10' from the front property line, as measured to the home or <br />front porch, and <br />k. Front porches are required on all single-family detached homes, and <br />1. No more than 33% of the perimeter lots and golf course lots can exceed the <br />15' front porch maximum setback. <br />11. The developer shall file with the County Planning Division an annual report on the <br />anniversary date of the Board of County Commissioners approval of the conceptual <br />PD plan in accordance with the annual report information specified in this report. <br />The report shall be filed annually for 20 years from the date of the first preliminary <br />PD plan approval or until project build out, whichever occurs first. <br />12. The institutional portion of all ALF/Total Care facilities within the project shall be <br />limited to the equivalent of 50 residential units. <br />13. One hotel facility is allowed in the project and shall be limited to 65 rooms, and shall <br />be located in Town Center only. <br />14. Prior to the issuance of an LDP for the Equestrian Facility, the developer shall <br />dedicate 30' of right-of-way for 81' Street without compensation to create the 60' local <br />road minimum. <br />15. Prior to issuance of an LDP for any phase adjacent to 18' Street in Greenbrier <br />Estates, the applicant shall either dedicate the right-of-way necessary to complete the <br />60' local road minimum or have the 18' Street half street right-of-way abandoned. <br />16. Prior to the issuance of the first Certificate of Occupancy for any unit in Phase 7, 16'h <br />Street shall be paved from 74d' Avenue to the project's easternmost 16th Street entry. <br />17. Prior to the issuance of the first Certificate of Occupancy for the equestrian facility, <br />741 Avenue shall be paved from the project entrance on 741h Avenue south to 12' <br />Street, and 121 Street shall be paved from 74* Avenue west to the westernmost <br />equestrian facility driveway. <br />18. The developer's agreement will set the timing for the paving of 1611 Street from the <br />westernmost project entrance to 82nd Avenue, and shall set an alignment for 12' <br />Street east of 74'h Avenue. <br />19. The developer shall comply with Emergency Services letter of Agreement dated <br />February 17,1999. <br />MARCH 9,1999 <br />52 <br />