Laserfiche WebLink
• Work Authorization No. 2 with the County's wastewater consultant, Glace & <br />Radcliffe, Inc., is for preparation of the detailed Engineering analysis and study for <br />Accidental Release Prevention, Hazard Analysis Assessment, Consequence Analysis <br />and Release Scenarios, as required for the County's ARP for the following plants, with <br />a not -to -exceed amount of $13,600.00: <br />Glace & Radcliff Work Authorization #2 Scope <br />1. North Regional Wastewater Treatment Plant <br />2. West Regional Wastewater Treatment Plant <br />3. Via Royal Wastewater Treatment Plant <br />4. Vista Gardens Wastewater Treatment Plant <br />5. Sea Oaks Wastewater Treatment Plant <br />6. Blue Cypress Wastewater Treatment Plant <br />Facilities 3-6, of the above, are under the RMP threshold set by EPA and are included to meet the <br />due diligence report requirements. <br />• Work Authorization No. 7 with the County's water consultant, Camp Dresser & <br />McKee, Inc., is for preparation of the detailed Engineering analysis and study for <br />Accidental Release Prevention, Hazard Analysis Assessment, Consequence Analysis <br />and Release Scenarios as required for the County's ARP for the following plants, with <br />a not -to -exceed amount of $26,150.00: <br />CDM Work Authorization #7 Scope <br />1. North Regional RO Water Treatment Plant <br />2. South Regional RO Water Treatment Plant <br />3. Central Regional Wastewater Treatment Plant <br />4. South Regional Wastewater Treatment Plant <br />Facilities 1-4, of the above, are in close proximity to schools, parks or residential areas and must <br />meet rigorous RMP requirements. To meet the RMP time frame, CDM must proceed with the <br />scope of the work beginning April 5, 1999. <br />The attached project time -line establishes deadlines and delineates responsibilities among task <br />team members. The Emergency Plan For Hazardous Materials, developed by the Department of <br />Emergency Services and adopted by Resolution 98-115, will serve as a core document to the <br />RMP and ARP. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of County <br />Commissioners approve the Task -team's recommendations and approve the final work <br />authorizations which are part of the RMP and ARP submittal process (see attached). Funding is <br />available in 471-218-033.19 and 471-219-033.19. <br />ONMOTIONby Commissioner Ginn, SECONDED <br />by Commissioner Adams, the Board unanimously <br />approved Attachment A Engineering Services Work <br />Authorization No. 2 with Glace & Radcliffe, Inc. <br />and Attachment A Engineering Services Work <br />Authorization No. 7 with Camp Dresser & McKee, <br />Inc., as recommended by staff. <br />DOCUMENTS ARE ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />APRIL 6, 1999 <br />-109- o`1 7 <br />600K PAGE ��:' � <br />L <br />