My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/6/1999
CBCC
>
Meetings
>
1990's
>
1999
>
4/6/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:29:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/06/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 10 PAGE d <br />2. Approve the conceptual PD plan and special exception use request with the following <br />conditions. <br />A. Prior to Land Development Permit issuance for any phase, the applicant <br />shall: <br />1. Obtain from the Department of Emergency Services approval of the <br />final location and design of an emergency access; and <br />2. Obtain jurisdictional permits for all wetland filling; and <br />3. Submit a final Jungle Trail landscape buffer plan and obtain planning <br />staff approval of the plan. <br />B. Prior to issuance of a Land Development Permit for any phase, the applicant <br />shall hold a pre -construction meeting with county staff and a consulting <br />archeologist to identify known archaeological sites that are to be avoided. <br />C. Prior to issuance of any C.O. (Certificate of Occupancy), the northbound left - <br />turn lane and southbound right -tum deceleration lane at the project's SR <br />A -1-A entrance shall be constructed and accepted by the FDOT. <br />APRIL 611999 <br />• <br />D. Prior to the issuance of a C.O. in Phase I, a canopy tree must be planted or <br />preserved for every 50 lineal feet of the project's south property line that is <br />east of the water treatment plaUL <br />E. Prior to issuance of a C.O. in the multi -family section (Phase IV) of the <br />project, the Jungle Trail buffer shall be planted, inspected and approved by <br />planning staff. <br />F. Prior to or via the final plat, a conservation easement shall be established for <br />the upland vegetation conservation area. <br />G. All structures shall be set back a minimum of 50' from the east edge of the <br />1984 Jungle Trail right-of-way line. <br />H. The developer shall have "Phase 11" testing conducted for any archeological <br />sites identified within any area of development, if applicable, and shall have <br />a new archeological survey conducted if any improvements are proposed <br />closer to Jungle Trail than depicted on the currently approved PD plan. <br />I. The developer shall have an archaeologist on site during the land clearing and <br />earthworks portion of constriction for any phases adjacent to Jungle Trail, <br />presently depicted on the multi -family section (Phase IV). <br />-70- 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.