My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/11/1999
CBCC
>
Meetings
>
1990's
>
1999
>
5/11/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:36:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/11/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />3�. The resulting_ impact fee for the protrosed land development activity will be <br />calculated using the trip generation rate, trip length, and percent new trips, <br />developed in the preceding sections, along with the current impact fee equation <br />construction cost and credit equation factors. <br />the pFejeeted gas and Reense we Fevenves, any other- Fe-venties. and the eapital <br />(c) Prior to conducting an individual assessment. the applicant and/or his transportation planner <br />or engineer must schedule a pre-atrolication conference with the county traffic engineer or <br />his designee to review the type of data and analysis needed and acceptable to the county_ <br />The traffic impact analysis submitted pursuant to section 953.07(3)(&)1: and 3. shall be <br />submitted by the developer of the proposed land development activity and shall be prepared <br />by qualified professionals in the field of transportation planning or engineering, and shall <br />be submitted to the county administrator, or his designee. <br />(d) Within twenty (20) days of receipt of a traffic impact analysis, the county administrator or <br />his designee shall determine if it is complete. If the county administrator determines the <br />application is not complete, he shall send a written statement specifying the deficiencies by <br />certified mail to the person submitting the application. Unless the deficiencies are corrected, <br />the county administrator shall take no further action on the traffic impact analysis. <br />(e) When the county administrator determines that the traffic impact analysis is complete, he <br />shall notify the applicant of its completion within (5) days, and he shall review it the <br />analysis within twenty (20) days. If it is not reviewed within these timeframes, then the item <br />will be scheduled for the next available board of county commissioners meeting. <br />(f) If on the basis of generally recognized principles of traffic engineering it is determined in <br />the individual assessment that the county's cost to accommodate the proposed land <br />development activity is substantially different than from the fee set down in section <br />953.07(2)(a), the amount of the "fair share roadway improvement fee" shall be varied from <br />that in the fee schedule to an amount consistent with the amount determined in the <br />individual assessment. <br />(g) Any person may appeal the county administrator's decision on his individual assessment by <br />filing a petition with the board of county commissioners within thirty (30) days of a decision <br />by the county administrator. In reviewing the decision, the board of county commissioners <br />shall use the standards established in section 953.07(3)(f). <br />(Ord. No. 90-16, § 1, 9-11-90; Ord. No. 9425, §§ 15, 16.8-31-94) <br />Section 953.08. Time of payment. <br />No building permit approval shall be issued until any applicable "fair share roadway improvements <br />fee" is paid according to these provisions. The obligation to pay the fee shall run with the land. <br />(Ord. No. 90-16, § 1, 9-11-90) <br />MAY 119 1999 <br />43 <br />• <br />BOOK 1091 °4C;.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.