My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/11/1999
CBCC
>
Meetings
>
1990's
>
1999
>
5/11/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:36:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/11/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Vice Chairman Adams, SECONDED BY <br />Commissioner Stanbridge, the Board unanimously awarded bid <br />#9056 to McCully Marine Services Inc., for the artificial reef <br />project and approved Change Order No. 1 to reduce the contract <br />cost to $29,900 (13 00 tons of material) and accepted the $5,000 <br />contributionfromthe Sebastian Inlet Sports Fishing Association, <br />as recommended in the Memorandum. <br />BID DOCUMENTS CAN BE FOUND IN TAE BACKUP FOR TAE M MMG <br />CHANGE ORDER IS ON FILE <br />IN TAE CLERK TO TAE BOARD OFFICE <br />H.H. PETITION WATER SERVICES - FLORAVON SHORES <br />(110TH PLACE <br />The Board reviewed a Memorandum of May 3, 1999: <br />DATE: MAY 3, 1999 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />'• DONALD R. HUBBS,�7 <br />I,_ • C • 1-1I1 .MM J NNi <br />PREPARED JAMES D. CHAST v <br />AND STAFFED MANAGER OF ASSB89NIENT PROJECTS <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: FLORAVON SHORES SUBDIVISION PETITION WATER SERVICE <br />(I le PLACE) <br />INDIAN RIVER COUNTY PROJECT NO. UW -99 -03 -DS <br />BACKGROUND <br />A petition has been received from the residents of 11 & Place, the V' of two streets in Floravon Shores <br />Subdivision requesting the County to supply potable water to its residents. A petition for water for <br />110' Street, the other street in this subdivision resulted in the installation of a County water system, <br />which was completed with the final assessment, September 1, 1998. We are now coming to the Board <br />of County Commissioners to seek approval to begin design of the above-mentioned project. (See <br />attached petition and plat map.) <br />ANALYSIS <br />Of the 13 homes on 110` Place (one under construction) 11 home owners have signed the petition <br />(85% of the homes) for County water due to substandard quality of their well water. Although this <br />MAY 119 1999 <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.