My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/13/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/13/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:47:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/13/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Thoroughfare Plan: <br />The Thoroughfare Plan classifies 96 Street SW as a major arterial roadway which <br />requires an ultimate right-of-way of 1301. Presently, 120' of right-of-wpy exists for <br />96 Street SW. The proposed conceptual plan accommodates the additional=10' of <br />right-of-way needed from this site to achieve the ultimate right-of-way. _ <br />The Thoroughfare Plan classifies 56 Street SW as a collector road requiring 80' of <br />road right-of-way. Presently, 30' of road right-of-way exists. The applicant will need <br />to dedicate an additional 30' without compensation to create the local road minimum <br />of 60'. Also, the county is negotiating to Purchase an additional 20' of right-of-way <br />to complete the 80' of ultimate road right-of-way for 56 Street SW. The 20' <br />acquisition will take place outside of the development review process. The plan <br />does accommodate all 50' of additional road right-of-way needed for 56 Street SW. <br />The Thoroughfare Plan classifies 586 Avenue as an arterial roadway that requires an <br />ultimate right-of-way of 1301. No additional right-of-way is requiredfor the project <br />site, due to the location of the Indian River Farms Water Control District Lateral B <br />Canal along the east side of 586 Avenue. <br />13. Traffic Circulation: <br />The project will be accessed from 96 Street and 56 Street SW. For the portion of the <br />development between 96 Street SW and 56 Street SW, a main entry road will run from 96 <br />Street SW to 56 Street SW. Individual "villages" will access the main entry road, which will <br />be dedicated to the public. <br />The project entry north of 56 Street SW will align with the proposed main entry road to the <br />south. The north area entrance road will branch out to provide access to the three Villages <br />located north of 56 Street SW. <br />A traffic impact analysis has been reviewed by Traffic Engineering. The review of that <br />analysis indicates that the following improvements are required to mitigate project traffic <br />impacts: <br />1. Westbound right -turn lane on 96 Street SW at the project's 96 Street SW entrance <br />2. West bound left -turn lane on 56 Street SW at the project's 56 Street SW entrance. <br />3. Eastbound left -turn lane on 56 Street SW at the project's 56 Street SW entrance. <br />4. Southbound left -turn lane on 586 Avenue (King's Hwy) at 56 Street SW/58th <br />Avenue intersection. <br />5. Three lane bridge over the Lateral B Canal to connect 56 Street SW to 586 Avenue <br />intersection. <br />6. Paving 56 Street SW from 586 Avenue to 43'd Avenue. <br />7. A southbound right -turn lane on 276 Avenue at its intersection with 86 Street. <br />A developer's agreement will control the timing of these and other required improvements. The <br />developer's agreement will need to be approved by the Board of County Commissioners prior to the <br />issuance of a land development permit. <br />July 139 1999 <br />51 <br />BOOK <br />PAGE`: <br />0- <br />
The URL can be used to link to this page
Your browser does not support the video tag.