My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/13/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/13/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:47:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/13/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Grin, the Board unanimously approved the date <br />changes and authorized the Chairman to sign the option <br />agreement, as recommended in the Memorandum. <br />OPTION ACRE M ENT AND ADDENDUM ARE ON FILE <br />IN THE OFFICE OF THE CLERIC TO THE BOARD <br />11.G.3. CR510 PAVED SHOULDERS - FELIX EQUITIES, INC. - <br />FDOT JOB 88000-3605 <br />The Board reviewed a Memorandum of July 7, 1999: <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />FROM: Terry B. Thompson, P. . <br />Capital Projects Manag <br />SUBJECT: Paved Shoulders on CR 510 <br />FDOT State Job Number 88000-3605 <br />DATE: July 7, 1999 <br />Felix Equities, Inc. is under contract with the Florida Department of Transportation to widen <br />and resurface 58"' Avenue from 6e Street to 85"' Street, and construct paved shoulders <br />on CR 510 from US 1 to a point east of Jungle Trail. This work is being constructed with <br />Federal ISTEA Enhancement Funding. <br />Staff has requested that the FDOT provide the County with a cost proposal to revise the <br />shoulder pavement cross section on CR 510 from a paved shoulder to a full pavement <br />section that will support traffic loading. This will allow the County to widen CR 510 in the <br />future without removing the 1.5 meter (4.92 feet) wide shoulders which will not support <br />traffic loads. <br />The bid price for the shoulder pavement construction on CR 510 is $65,416.00. The <br />additional cost to the County to construct a full pavement section is $71,500.00. This price <br />is based on the contract quantities contained in the FDOT contract. After construction,the <br />County will pay Felix based on actual quantities measured in the field. Actual quantities <br />are estimated to be approximately 10% less than the bid quantities because of two projects <br />in the area that are under construction. Removing and reconstructing the shoulder in the <br />future, if a full pavement section is not constructed at this time, is estimated to cost <br />$180,000.00. <br />Because of the extensive paper work that would be required for the FDOT to process a <br />change order to their contract, they have requested that the County pay Felix directly for <br />July 13, 1999 <br />73 <br />BOOK iW PAGE Cry <br />
The URL can be used to link to this page
Your browser does not support the video tag.