My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/20/1999
CBCC
>
Meetings
>
1990's
>
1999
>
7/20/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:57 PM
Creation date
6/17/2015 12:48:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_I <br />BOOK PAGE Cid <br />• PD Project Process <br />The process involved in review and approval of this proposal is as follows: <br />1. Conceptual Plan/Special Exception PZC & BCC <br />2. Preliminary PD PZC <br />3. Land Development Permit (LDP) or Waiver Staff <br />4. Final PD (plat) BCC <br />The applicant is now requesting approval of the first two steps. If approved by the Board of County <br />Commissioners, the applicant will need to obtain from public works an LDP or LDP waiver for <br />required PD improvements. <br />• Board of County Commissioners Consideration <br />Pursuant to Section 971.05 of the LDRs, the Board of County Commissioners is to consider the <br />appropriateness of the requested conceptual PD plan based on the submitted PD plan and suitability <br />of the site for that use. The Board may approve, approve with conditions, or deny the special <br />exception use. The County may attach any conditions and safeguards necessary to mitigate impacts <br />and to ensure compatibility of the use with the surrounding area. <br />1. Size of PD Area: <br />2. Zoning Classification: <br />3. Land Use Designation: <br />4. Density: <br />15.2 acres (including access roadway) <br />A-1, Agricultural (up to 1 unit per 5 acres) <br />AG -1, Agricultural (up to 1 unit per 5 acres) <br />Allowed: <br />PMposed:- <br />5. Marimnm Lot/Homesite Area: <br />6. Open Space: <br />Allowed:- <br />Proposed:. <br />llowed:Proposed: <br />Required: <br />Provided: <br />7. Surrounding Land Use and Zoning. <br />0.20 units per acre <br />020 units per acre <br />1 acre <br />1 acre (encompassed within t 5 acre tract) <br />60% <br />80% <br />North: Grove/A-1 <br />South: Grove/A-1 <br />East: Grove/A-1 <br />West: Single -Family, Grove/A-1 <br />S. Traffic Circulation: Due to the small number of units proposed, no special traffic study and <br />no off-site traffic improvements are required. All of the lots will access 10 Street SW <br />(paved) from 631' Court which will be the internal local road constructed within the proposed <br />development. The preliminary PD plan proposes 631d Court as a stabilized, unpaved roadway <br />within a private 60' right-of-way. The LDRs allow such a road to be unpaved, because the <br />subdivision is private, generates less than 100 daily trips and is looted outside the Urban <br />Service Area. The Traffic Engineering Division has reviewed and approved the roadway <br />layout. <br />The proposed subdivision road (631' Court) runs along the east property line of a "not - <br />included" parcel. Under most circumstances this would require the developer to construct <br />a double frontage buffer to buffer the adjacent property from the proposed new roadway. <br />However, the applicant will be providing the owner of the not -included parcel access rights <br />to the roadway, which removes the need for the double frontage buffer. In essence, the <br />adjacent property owner will benefit from and use 63"d Court and will not need to be buffered <br />from it. <br />JULY 209 1999 <br />-32- <br />0 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.