Laserfiche WebLink
1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Size of PD Area: <br />Zoning Classification: <br />Land Use Designation: <br />Density: <br />15.18 acres <br />A-1, Agricultural (up to 1 unit per 5 acres) <br />AG -1, Agricultural (up to 1 unit per 5 acres) <br />Allowed: <br />Proposed: <br />Maximum Lot/Homesite Area: <br />Open Space: <br />Allowed: <br />Proposed: <br />Required: <br />Provided: <br />0.20 units per acre <br />0.20 units per acre <br />1 acre <br />1 acre (encompassed within f 5 acre tract) <br />60% <br />80% <br />Surrounding Land Use and Zoning: <br />North: Grove/A-1 <br />South: Grove/A-1 <br />East: Grove/A-1 <br />West: Single -Family, Grove/A-1 <br />8. Traffic Circulation: Due to the small number of units proposed, no special traffic study and <br />no off-site traffic improvements are required. All of the lots will access 49m Street (unpaved) <br />from 691h Court, a proposed internal local road to be constructed within the proposed <br />development. The preliminary PD plan proposes 691' Court as a stabilized, unpaved roadway <br />within a private 60' right-of-way. The LDRs allow such a road to be unpaved, because the <br />subdivision is private, generates fewer than 100 daily trips and is located outside the Urban <br />Service Area The Traffic Engineering Division has reviewed and approved the roadway <br />layout. <br />The proposed subdivision road (694 Court) runs along the east edge of the subject property <br />and is actually centered along the east property line, forming a common road with the <br />adjacent property. The result is that half of the road is to be located on a not -included parcel <br />to the east, within an existing common access easement on the not -included parcel. For the <br />half of road on the not -included parcel, an easement agreement document takes care of <br />ownership, construction and maintenance responsibilities. A recorded copy of the easement <br />agreement document will need to be provided prior to the issuance of a land development <br />permit. Because the proposed road will also provide access to the not -included parcel, no <br />double frontage buffer is required. For the half of the road to be located on the subject <br />property, a reciprocal access easement will be provided via the final plat. The reciprocal <br />access easement will provide access rights to the not -included owner for the platted portion <br />of the road. <br />9. Stormwater Management: The Public Works Department has reviewed and approved a <br />conceptual stormwater plan. A detailed engineering stormwater plan will be reviewed and <br />approved as part of the land development permit or permit waiver process. The applicant <br />will need to obtain a county Type "B" stormwater permit prior to the issuance of a land <br />JULY 279 1999 <br />Rt <br />_T <br />600K OO FAGE tJ <br />