My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/1999
CBCC
>
Meetings
>
1990's
>
1999
>
11/16/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:58 PM
Creation date
6/17/2015 10:21:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environment <br />The subject property is not designated as environmentally important or environmentally sensitive <br />by the comprehensive plan. No wetlands or native upland plant communities exist on site. <br />According to Flood Insurance Rating Maps, the subject property does not contain any flood hazard <br />areas. <br />Utilities and Services <br />The site is within the Urban Service Area of the county. Wastewater collection lines extend to the <br />site from the West Region Wastewater Treatment Plant, while Mable water distribution lines extend <br />to the site from the South County Reverse Osmosis Plant. <br />Transportation System <br />The site is bounded on the south by SR 60. Classified as an urban principal arterial roadway on the <br />future roadway thoroughfare plan map, this segment of SR 60 is a four lane road with approximatey <br />I <br />163 feet of public road right-of-way. By 2005, the Florida Department of Transportation plans to <br />begin construction to expand the portion of SR 60 between 66`� Avenue and Interstate 95 from four <br />lanes to six lanes. <br />In this section, an analysis of the reasonableness of the rezoning request will be presented. <br />Specifically, this section will include: <br />• an analysis of the request's impact on public facilities; <br />• an analysis of the request's consistency with the county's comprehensive plan; <br />• an analysis of the request's compatibility with the surrounding area; and <br />• an analysis of the request's potential impact on environmental quality. <br />Concurrency of Public Facilities <br />This site is located within the county Urban Service Area, an area deemed suited for urban scale <br />development. The Comprehensive Plan establishes standards for. Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation. The adequate provision of these services is <br />necessary to ensure the continued quality of life enjoyed by the community. The Comprehensive <br />Plan and Land Development Regulations (LDRs) also require that new development be reviewed <br />to ensure that the minimum acceptable standards for these services and facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since rezoning requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the subject property based upon the <br />requested zoning. For residential rezoning requests, the most intense use (according to the County's <br />LDRs) is the maximum number of units that could be built on the site, given the size of the property <br />and the maximum density under the proposed zoning. The site information used for the concurrency <br />analysis is as follows: <br />NOVEMBER 16, 1999 <br />-93- BOOK FAGUE d <br />
The URL can be used to link to this page
Your browser does not support the video tag.