My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/11/2000
CBCC
>
Meetings
>
2000's
>
2000
>
01/11/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:07 PM
Creation date
6/17/2015 11:11:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval. He reviewed the usage and the zoning and advised that all buffers will be installed <br />as required. He stated that the enclave owner, Payson, has written a letter agreeing to the <br />project. He stated that there was a slight disagreement on the naming of the streets. He gave <br />examples of how numbered streets (complying with the County's grid system) within the <br />project would be very confusing and requested that the developer be permitted to use names <br />to designate the streets rather than numbers. He reviewed how the proposed conceptual PD <br />plan agrees with Objective 5 in the Future Land Use Element and stressed the location is <br />within the urban service area on major thoroughfares. He reviewed the properties along the <br />perimeter of the development area and indicated that most of the immediate neighbors are <br />in support of the project. <br />John Haley, President of Suntree Partners, the applicant, pointed out how this <br />proposed project differs from the previously submitted projects and how it has been <br />improved significantly. They have reduced the density and increased the open space and <br />usable green space. They have added a "pedway", parks and sidewalks. He reviewed each <br />village, giving the projected intended users and the types of home and lifestyle that would <br />be furnished in each of the villages. The recreation center will be completed with the <br />completion of Villages A, B & C. There will also be a soccer field and school bus <br />turnarounds will be provided. He thought this to be a very good project for Vero Beach and <br />Indian River County and urged the Board's support. <br />Susan Cobb, 5920 5' Street SW, was concerned about the impact of quantity versus <br />quality. She was also concerned about the increase of traffic and noise. She stated that 58'h <br />Avenue is only 1/6th completed and we are still another five years from completion. She <br />suggested the developer hold off until the 58t` Avenue improvements have been completed. <br />Roy Hirschfeld, 4055 12'h Street SW, presented handouts and petitions to the <br />Commissioners and stated this was an inappropriate zoning request for the neighborhood. <br />January 11, 2000 <br />ER <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.