Laserfiche WebLink
VENDOR <br />BASE BID <br />ALT. No.1 <br />ALT. No. 2 <br />ALT. No. 3 <br />COMBINED <br />William Glover. Inc. <br />$695,146.46 <br />$25,407.00 <br />$6,393.60 <br />$3,749.76 <br />$730,696.82 <br />Melbourne, FL. <br />Summit Const. <br />$750,150.59 <br />$52,682.00 <br />$8,960.00 <br />$5,880.00 <br />$817,672.59 <br />Vero Beach. FL. <br />Lucas Marine Const. <br />$769,895.17 <br />$62,750.00 <br />$5,600.00 <br />$6,650.00 <br />$844,895.17 <br />Hobe Sound, FL. <br />Butler Const. <br />$789,270.00 <br />$56,350.00 <br />$9,200.00 <br />$6,118.00 <br />$860,938.00, <br />Rockledge, FL. <br />Bill Bryant Assoc. <br />$799,531.00 <br />$53.700.00 <br />$9,600.00 <br />$7,000.00 <br />$869,831.00 <br />Vero Beach. FL. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Base Bid, plus Alternate No. 1, totaling $720,553.46, be awarded to William Glover, Inc. <br />as the lowest, most responsive and responsible bidder meeting specifications as set forth in the Invitation to Bid. <br />Although the lowest bid is substantially higher than the consultant's estimate, we believe that it is the lowest price <br />that we are likely to receive in the current bidding market. In addition to a very busy construction industry, <br />Hurricanes Floyd and Irene have generated even more projects for the local community of marine contractors. This <br />has caused prices to rise faster than we could have anticipated when the estimate was prepared over a year ago. <br />Staff fiirther recommends that Change Order No. 1 be accepted, for a net credit of $28,284.27. These credits have <br />been offered by William Glover, Inc., for cost saving changes to the design of the building's foundation and framing <br />design. William Glover, Inc., will provide signed & sealed design drawings for submission to the Building <br />Department for permitting of the new design. The revised contract amount would be $692,269.19. <br />This project is supported by several grants from State and local agencies which would require amendments, and <br />perhaps reduced funding support, if we remove any of the major elements of the project scope. The MOT Highway <br />Beautification Grant has provided $150,000, the FIND Waterways Assistance Program has provided $120,000, and <br />the SJRWMD Indian River Lagoon Program has provided $100,000. Funding for the County's share is <br />recommended as follows: 315-210-572-068.09 (1 Cent Sales Tax) $170,000.00 <br />117-210-572-068.09 (Tree Fine Funds) $ 20,000.00 <br />133-210-572-068.09 (Florida Boating Improvement Prog) $ 80,000.00 <br />109-214-541-066.31 (Road Funds) $ 52,269.19 <br />In addition, staff requests authorization for the Chairman to sign the contract and change order documents after they <br />have been executed by the Contractor with all the required insurance and recorded bonds and upon review and <br />approval as to form by the County Attorney. A sample Agreement, and Change Order No.I are attached for review. <br />ATTACHMENT <br />Sample Agreement <br />Sample Change Order No. 1 <br />Vice Chairman Ginn inquired why stemwall construction was being used for the <br />project and not pilings, and Public Works Director James W. Davis explained that it was to <br />keep the cost down; he assured her that it would provide a solid foundation and is <br />appropriate for this area. <br />Director Davis responded to Chairman Adams' request for a clarification on the costs <br />and funding. <br />February 15, 2000 <br />64 <br />40 0 <br />