My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/2000
CBCC
>
Meetings
>
2000's
>
2000
>
4/4/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/9/2015 1:11:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/04/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />required sidevard setbacks from 14' to 10'. This setback modification did not affect the preliminary <br />plat design, including lot sizes and layout. The approved preliminary PD plan is consistent with the <br />approved and modified conceptual PD plan, and proposes 15 detached single-family homes on <br />individual lots with reduced setbacks. Subsequent to preliminary plan/plat approval, a land <br />development permit was issued for construction, and construction has commenced. The owner, <br />Vernon G. Foster, through his agent, Shalloway, Foy, Rayman and Newell, Inc., is now requesting <br />final plat approval and has submitted the following: <br />A final plat for Pelican Pointe Phase II PD in conformance with the approved preliminary <br />plat. <br />2. A cost estimate for the remaining required subdivision improvements. <br />A contract for construction of the remaining required subdivision improvements. <br />4. A letter of credit to guarantee construction of the remaining required improvements. <br />ANALYSIS: <br />At this time, construction of some of the required subdivision improvements has commenced. The <br />applicant has submitted a contract for construction for all of the remaining required subdivision <br />improvements, along with a letter of credit to secure the contract. Both the county engineering <br />division and the utility services department have approved the cost estimate and have verified that <br />the letter of credit amount is adequate to cover the estimated cost of the remaining required <br />improvements. The county attorney's office has approved the construction contract for legal form <br />and sufficiency and has approved the format of the letter of credit. <br />All applicable requirements regarding final plat approval have been satisfied. Pursuant to the <br />county's LDRs, the applicant will be required to obtain a certificate of completion from public works <br />after construction of the required improvements. At that time, the applicant will separately warranty <br />the utility improvements via a Utility Services department Bill of Sale. Since no other improvements <br />are being dedicated to the public, no other warranties will be required. <br />RECOMMENDATION: <br />Based on the above analysis, staff recommends that the Board of County Commissioners grant final <br />PD plan/plat approval for the Pelican Pointe Phase II Planned Development and authorize the <br />chairman to sign the contract for construction and accept the letter of credit that secures the contract. <br />APRIL 4, 2000 <br />-31- BOO ,';iC <br />• <br />