My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/11/2000
CBCC
>
Meetings
>
2000's
>
2000
>
4/11/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:02:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />BOOK i i.j PAGE cS <br />RECOMMENDATION: <br />Based on the above analysis, staff recommends that the Board of County Commissioners grant final <br />plat approval for Island Club Riverside Phase IV and authorize the chairman to sign the contract for <br />construction and accept the performance bond that guarantees that contract. <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Plat <br />4. Contract for Construction (Draft) <br />5. Performance Bond (Draft) <br />Commissioner Stanbridge reported that she had received a call from the Michael <br />family who have lived along Jungle Trail for many decades. She stated that Gordon Michael <br />would be showing the Board some photographs of the jungle (on the Jungle Trail) that has <br />been removed near the area of the Beazer site. She asked the Board's approval to have Mr. <br />Michael come forward with his photographs. <br />Community Development Director Robert M. Keating gave a brief overview of the <br />Island Club Riverside Plat IV which was scheduled for final plat approval at this meeting. <br />The preliminary plat was approved by the Planning and Zoning Commission. They have <br />obtained a land development permit, done some construction and bonded out for the rest; <br />that information is in the agenda backup. Recently, staff learned that Beazer had done some <br />clearing in the buffer. They originally had a plan to do required landscaping in the Jungle <br />Trail buffer; they were going to preserve trees and some wetlands there. He understood the <br />situation changed somewhat: instead of preserving the wetlands, they bought some credits <br />in the mitigation bank and they changed their Jungle Trail buffer plan without informing the <br />County and without approval. In so doing they removed some trees they should not have <br />removed. Director Keating had requested that the item be removed from the agenda so staff <br />could work out several issues with the developer. The maximum fine provided is $500 per <br />April 11, 2000 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.