My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/9/2000
CBCC
>
Meetings
>
2000's
>
2000
>
5/9/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:04:55 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/09/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, !t' <br />600K iiJ PAvEJr° <br />11.H.2. MASTER PLANNED 16 -INCH WATER MAIN ALONG <br />INDIAN RIVER BOULEVARD (FIBER OPTICS) - ASSET <br />CHANNELS TELECOM, INC. DEVELOPER'S <br />AGREEMENT <br />The Board reviewed a Memorandum of April 27, 2000: <br />DATE: APRIL 27, 2000 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR , ` <br />FROM: DONALD R. HUBBS, P.E. 1l'i` <br />DIRECTOR OF UTII..rIY <br />PREPARED STEVEN J. DOYLE, P.E. <br />AND STAFFED CAPITAL PROJECTS MANAGER <br />BY: <br />SUBJECT: DEVELOPER'S AGREEMENT WITH SEI CHANNELS TELECOM INC. <br />MASTER PLANNED 164NCH WATER MAIN ALONG INDIAN RIVER BLVD. <br />BACKGROUND & ANALYSIS <br />Asset Channels Telecom Inc. is a fiber optic communication company, which desires to install multiple <br />fiber-optic communication lines along Indian River Boulevard through the City of Vero Beach. A 16 -inch <br />Master Plan water main is scheduled for construction along Indian River Boulevard. Exhibit -A depicts the <br />mute for the proposed water main. The I&mc h Master Plan water main is slated for construction in the year <br />20002001. <br />Asset Channels Telecom Inc. has agreed to eater into an agreement with the County to construct the master <br />planned water main along the Boulevard in conjunction with their fiber-optic conduit runs. <br />The County's Master Plan identifies the need for a 164nch transnission water main along the enstem <br />portion of the County's water distribution system. The proposed 164nch water main shall extend along the <br />Boulevard from the City of Vem Beady south City Limits north to 371 Street and make connection to a 16 -inch <br />watedm currently under construction ficin Grand Harbor. The completed 16 -inch main along the entire <br />Boulevard will complete a major water distribution loop between the South and North County Distribution <br />Systems. <br />The County's water distribution system is comprised of two Reverse Osmosis (RO) Facilities, which are <br />loomed geographically to serve tare northern and southern portions of the County. Currently the water <br />distribution systems are interconnected with a single 20 -inch water main along 581 Avenue. This one pipeline <br />along 581 Avenue is the only mesas of transferring drinking water between the County RO Facilities. <br />MAY 099 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.