D. Construction Contingency & Fees (20% of A & B) <br />S 76.000.00 <br />Total Option 3 <br />5486,000.00 <br />Optional Upgrades (Includes Construction Contingency & Fees) <br />A. Re -roof Existing (20,000 sf) <br />S100,000.00 <br />B. Re -paint Existing Exterior (allowance) <br />50,000.00 <br />C. Re -paint Existing Interior (allowance) <br />35,000.00 <br />D. Replace Existing Second Floor Carpet (1,300 sf) <br />45,000.00 <br />E. Replace Existing Book Security System <br />15,000.00 <br />F. Repulse Existing Chiller <br />155,000.00 <br />G. Reinforce Multi-purpose Room Roof Stnrcture <br />95,000.00 <br />H. Impact Resistant Window System Upgrade <br />130,000.00 <br />(New Construction Only) <br />Sub -total: <br />I. Replace Existing Fire Alarm System <br />S 75DW-00 <br />Total Optional Upgrades <br />5700,000.00 <br />MAIN LIBRARY GRAND TOTAL <br />1,037,562 <br />BOOK iiJ PAGE 40' <br />53,137,000.00 <br />TOTAL COSTS OF BOTH PROJECTS INCLUDING ALL OPTIONS AND UPGRADES: SSA32-S01.00 <br />On April 10, the Public Library Advisory Board reviewed the two projects and recommended <br />that both projects be funded and constructed with all options. There was no determination from <br />where the needed additional financing would come. It should be noted that the recommendation <br />was a majority vote with one dissenting vote. <br />The problem of funding is the shortfall ($3,144,412) between the estimated total cost of the <br />projects with all options ($5,032,501) and the amount approved for the two projects <br />($1,888,089.) It becomes very apparent that unless additional funds could be located, it was <br />unlikely that the projects could be developed to meet the needs of each library. Receipts of the <br />sales tax are not sufficient to pick up the additionally needed funds and would require re - <br />prioritization of other budgeted projects if that was deemed a source to use. <br />SCENARIO 1 <br />Main Library <br />Option 1 (NW Expansion) <br />723,800 <br />with upgrades <br />700,000 <br />less floor reinforcement <br />(95,000) <br />less hurricane windows <br />(130.000) <br />No. Co. Library <br />Sub -total: <br />1,198,800 <br />No. Co. Library <br />Option 1 (meeting room add.) <br />461,388 <br />with upgrades <br />117.300 <br />Sub -total: <br />578.688 <br />Funds Available <br />Total: <br />1,777,488 <br />Funds Available <br />1,037,562 <br />North County <br />1,037,562 <br />Main Library <br />850,527 <br />1,888,089 <br />1,888,089 <br />West Ubrary <br />Balance: <br />110,601 <br />MAY 239 2000 <br />SCENARIO 2 <br />Main Library <br />Option 2 (ExMing Terrace) <br />888,000 <br />with upgrades <br />700,000 <br />less hurricane windows <br />(130,000) <br />Sub -total: <br />1,458,000 <br />No. Co. Library <br />Option 1 (meeting room add.) <br />461,388 <br />with upgrades <br />117,300 <br />Sub -total: <br />578,688 <br />Total: <br />2,036,688 <br />Funds Available <br />North County <br />1,037,562 <br />Main Library <br />850.527 <br />1,888,089 <br />Balance: <br />(148,599) <br />West Ubrary <br />1264,868 Balance: <br />1,116,269 <br />I <br />