My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/2000
CBCC
>
Meetings
>
2000's
>
2000
>
5/23/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:18 PM
Creation date
6/16/2015 4:06:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/23/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />i <br />VII. Other Costs (Adjusted, See Attachment "C') <br />320.161.00 <br />Total <br />$1,392,197.00 <br />ADDITIVE EXISTING BUILDING UPGRADES <br />$118.000.00 <br />V. Existing Building Upgrades <br />$723,010.00 <br />A. New A/C Controls <br />S 28,000.00 <br />B. New Roof <br />30,000.00 <br />C. New Carpet <br />38,000.00 <br />D. Termite Proof Perimeter <br />10,000.00 <br />E. Remodel Book Sales <br />1,500.00 <br />F. Remodel Technical Support Offices <br />1,500.00 <br />G. Remodel Book Drop <br />6,300.00 <br />H. New Entrance Doors <br />1.500.00 <br />Total <br />S 117,300.00 <br />TOTAL NORTH COUNTY PROJECT COSTS <br />SIJM,501.00 <br />MAIN LIBRARY: <br />Option 1 <br />Scope: Includes Expansion and /or remodeling of the Children's Department (Areas IA & IB) and Florida <br />History & Genealogy Department (Areas 2A & 2B) and Reference Workroom (Area 2D). <br />A Site Development <br />S 25,000.00 <br />B. Building Construction <br />538,000.00 <br />C. Furniture/Fixtures/Equipment (S7/sf allowance) <br />42,000.00 <br />D. Construction Contingency & Fees (205/a of A & B) <br />$118.000.00 <br />Total Option 1 <br />$723,010.00 <br />Option 2 <br />Scope: Includes relocation of the Reference Desk (Area 2C) and expands the Compute and expands the <br />Computer & Reading Departments (areas 2E & 10). <br />A. Site Development $ 0 <br />B. Building Construction 711,000.00 <br />C. Furniture/Fixtures/Equipment (S7/sf allowance) 35,000.00 <br />D. Construction Contingency & Fees (20% of A & B) $142-000.00 <br />Total Option 2 $888,000.00 <br />Option 3 <br />Scope: Includes expansion and/or remodeling of the Gift Shop, Meeting Room, Adult Literacy & <br />Technical Services (Areas IC, ID & IE) and remodels the Administration to provide an additional Office <br />(Area 2H). <br />A. Site Development <br />$ 25,000.00 <br />B. Building Construction <br />238,000.00 <br />C. Furninaw'Fixtures/Equipment (S7/sf allowance) <br />24,000.00 <br />D. Construction Contingency & Fees (2(rof A & B) <br />S 53.000.00 <br />Total Option 3 <br />$340,000.00 <br />Option 4 <br />Scope: Includes expansion of Storage Area (1F) and the Media/Periodical Departments (Area 2F) and <br />remodeling of the existing Media Department into a new Meeting Room and additional shelving space <br />(Area 2G). (Note: This will provide additional Second Level floor area that can support the 120 psf live <br />load required for book shelving.) <br />A. Site Development S 25,000.00 <br />B. Building Construction 356,000.00 <br />C. Furmture/Fixtures/Egwpment (S7/sf allowance) 29,000.00 <br />MAY 239 2000 <br />-49- BOOK 11� PAGE °lU <br />
The URL can be used to link to this page
Your browser does not support the video tag.