Laserfiche WebLink
BOOK LIF 13 PAGE 4 aaul <br />would see an increase to new expansion of 750 sf with 3,668 sf being remodeled and the reading <br />room would increase by 6,680 sf in new addition with 1,040 sf in remodeling. <br />While a slightly larger amount of funds have been set aside for the North County Library <br />addition, the proposed additions and approved funding also appeared to fall short of the <br />estimated costs. Site cost considerations cut into portions of available funding that could be <br />available for the constructions phase of the project There were a number of other costs that <br />would be incurred similar to the Main Library (potential maintenance items). Just like the Main <br />Library addition, Edlund & Dritenbas were tasked to prepare similar analysis as that to be done <br />by Dow Howell Gilmore. Attached is copy of the results of that request. <br />In both reports, the projects respectively have been broken into a series of smaller projects that <br />can more easily be funded if approved as stand-alone elements or in combinations with other <br />elements of the addition: <br />NORTH COUNTY LIBRARY: <br />OPTION 1 <br />I. <br />Meeting Room Addition <br />$127,000.00 <br />IV. <br />Front Entrance Addition <br />$ 26,400.00 <br />VI. <br />Site costs <br />$188,036.00 <br />VIA. <br />Utility Easement Modifications <br />$ 20.000.00 <br />Subtotal <br />$361,436.00 <br />VII. <br />Other Costs (Adjusted, See Attachment "C") <br />S 99.952.00 <br />Total <br />$461,388.00 <br />OPTION II <br />II. Children's Area Addition/Remodeling <br />$ 332,580.00 <br />VI. Site costs <br />$ 188,036.00 <br />VIA. Utility Easement Modifications <br />$ 20.000.00 <br />Subtotal <br />$ 540,616.00 <br />VII. Other Costs (Adjusted, See Attachment "C") <br />S 120559.00 <br />Total <br />$ 661,175.00 <br />OPTION III <br />H. Children's Area Addition/Remodeling <br />III. Reading Room Addition <br />VI. Site costs <br />VIA. Utility Easement Modifications <br />Subtotal <br />VII. Other Costs (Adjusted, See Attachment "C') <br />Total Option III <br />OPTION 1V <br />M. Reading Room Addition <br />VL Site cis <br />VIA. Utility Easement Modifications <br />Subtotal <br />MAY 239 2000 <br />S 332,580.00 <br />$ 864,000.00 <br />$ 188,036.00 <br />S 20.000.00 <br />$1,404,616.00 <br />$ 379.842.00 <br />$1,783,842.00 <br />$ 864,000.00 <br />188,036.00 <br />20.000.00 <br />1,072,036.00 <br />-48- <br />• 0 <br />I <br />