My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/2000
CBCC
>
Meetings
>
2000's
>
2000
>
6/20/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 8:46:17 AM
Creation date
6/9/2015 1:19:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Stanbridge, SECONDED BY <br />Commissioner Tippin, the Board unanimously (4-0, Chairman <br />Adams absent) approved Change Order No. 5 and Final Release <br />of Retainage to be paid to Dickerson Florida, Inc., as <br />recommended in the memorandum. <br />COPIES OF CHANGE ORDER & FINAL RELEASE ARE ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />11.H.1. SEBASTIAN CHARTER JUNIOR HIGH, INC. - <br />DEVELOPER' S AGREEMENT FOR WATER MAIN CONSTRUCTION <br />AT CHESSER GAP CHARTER SCHOOL IN SEBASTIAN <br />The Board reviewed a Memorandum of June 13, 2000: <br />DATE: JUNE 13. 2000 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: DONALD R HUBBS, P.E. <br />DIRECTOR OF UTII IT)L: <br />PREPARED STEVEN J. DOYLE. P.E. N <br />4 <br />AND STAFFED CAPITAL PROJECTS MANAGERI <br />BY: <br />SUBJECT: DEVELOPER'S AGREEMENT F R CHESSER GAP CHARTER SCHOOL <br />SEBASTIAN. FL. <br />WATER MAIN CONSTRUCTION <br />BACKGROUND <br />Chesser Gap Charter School is a proposed 8,247 square foot institutional development located at the <br />southwest tor= of Wave Street and Fleming Street in Sebastian. A 12 mch waterlme is proposed along <br />Fleming Street to serve current residue and provide a water distribution system loop. The water main shall be <br />constructed along the south side of Fleming Street, thence south along the east side of Wave Street and then <br />c m wrt to an existing water main along George Street The new property owners, Sebastian Charter Junior <br />High Inc., bas agreed to carter into a cost sharing aweement with the County to construct the proposed water <br />main in conjunction with their site development. <br />Attached is a proposed developer's agreement with Sebastian Charter Junior High, Inc. for reimbursement <br />of a portion of the subject wafer main. <br />June 20, 2000 <br />98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.