My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/2000
CBCC
>
Meetings
>
2000's
>
2000
>
6/20/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 8:46:17 AM
Creation date
6/9/2015 1:19:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOK hJ PAGE 7�5i0 <br />In planning staffs opinion, the PD rezoning option is the best alternative for approving residential <br />development on the subject site. Unlike other zoning districts, the PD zoning district allows the <br />county to consider the appropriateness of the proposed development design and project benefits as <br />part of the rezoning request, and to attach conditions to the PD plan approval. <br />♦ The PD Rezoning Process <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1 Rezoning and conceptual PD plan approval: Review and recommendation made by <br />staff and by the Planning and Zoning Commission. Final action taken by the Board <br />of County Commissioners. <br />STEP 2 Preliminary PD plan (combination of site plan and preliminary plat) approval: <br />Review and recommendation made by staff. Final action taken by the Planning and <br />Zoning Commission. subject to the Board's action on the rezoning request. <br />STEP 3 Land Development Permit or Permit Waiver. Reviewed and issued b_v staff for <br />construction of subdivision improvements (roads. utilities, drainage). <br />STEP 4 Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />STEP 5 Final PD Plat approval: Review and recommendation made by staff. Final action <br />taken by the Board of County Commissions. <br />STEP 6 Certificate of Occupancy: Reviewed and issued by staff for use and occupancy of <br />buildings. <br />The applicant is pursuing STEP 1 of the process. <br />Once a conceptual PD plan is approved, only minor modifications to the conceptual plan can be <br />approved at a staff level. Any changes proposed to an approved conceptual plan that would reduce <br />setbacks, intensify the site use (e.g. increase the maximum number of lots), or reduce compatibility <br />elements (e.g. reduce buffering) can be approved only via a process involving public hearings held <br />by both the Planning and Zoning Commission and the Board of County Commissioners. <br />♦ Proposed PD District for the Project Site <br />The majority of the subject site has an L-1, low density residential, land use designation. with a <br />portion also designated C-2 conservation, and a small area designated C/I Commercial/Industrial. <br />The L-1 land use designation allows a variety of single-family districts and a multi -family zoning <br />district, each of which has a maximum density of 3 units/acre or less. Since the land use designation <br />controls the use of the property by limiting the zoning districts applicable to the property, any <br />rezoning must be compatible with the uses and densities allowed by the property's land use <br />designations. Once a specific PD rezoning is approved for a site, the applicable PD conceptual plan <br />adopted as part of the rezoning will limit the type of specific uses and the densities allowed on the <br />subject site. The conceptual plan will also establish the dimensional criteria applicable to the site. <br />Although PD zoning district parameters are flexible. certain standards related to uses, compatibility <br />(buffering), infrastructure improvements, dimensional criteria, and open space areas are set forth in <br />Chapter 915 (P.D. Process and Standards for Development ordinance) of the county's land <br />development regulations (LDRs). The River Bend project proposes 11 residential development <br />..pods", with separate standards for each single-family development type based on lot width. Several <br />of the pods contain multi -family units which will be site planned at a later date through the <br />June 20, 2000 <br />62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.